Description:

National Operating Procedure (NOP) 5.04: Management of Station Works

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to all areas of Network Rail Managed Stations including areas leased to third parties except at:

• St Pancras (Midland Road) Station, where this is covered by the St Pancras International Station arrangements.

• Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

This procedure covers the process for allowing works to be carried out on Network Rail Managed Stations, from receiving an application for works, to signing off the work as complete and subsequent monitoring.

PURPOSE

This procedure maintains the safety of the station by providing a framework to allow:

• All contractors to have their Risk Assessment / Method Statement (RAMS) or work package plan approved.

• Eliminate as much risk as possible from the planned works prior to persons arriving at site.

• Reduce the risk to an acceptable level when work is carried out on the station.

• Management of approved works on the station to completion.


Edition : 1
File Size : 1 file , 210 KB
Number of Pages : 8
Published : 09/02/2017

History


Related products

NR BRS-SE 81 ISSUE G
Published Date: 05/06/1992
Colour Light Signals Construction Requirements for Long Range Multi-Aspect Signal Heads
$5.7
NR NR/CIV/SD/1456 ISSUE D
Published Date: 12/01/2018
D-Type Underbridges: Protective Treatment: Steel Floor Sheet 1 of 2
$5.7
NR BRS-SM 501/2 ISSUE L
Published Date: 12/19/1984
Rail Clamp Point Lock Body Frame
$5.7
NR NR/L3/CIV/140/230C ISSUE 1
Published Date: 05/01/1997
Model Clause 230C: General Requirements for Level Crossings
$5.7

Best-Selling Products

AEIC CG1-19
Published Date: 06/01/2019
Guide for Establishing the Maximum Operating Temperatures of Impregnated Paper and Laminated Paper Polypropylene Insulated Cable - 5th Edition
$15
AEIC CG14-19
Published Date: 10/24/2019
Guide for the Design of Transmission Vaults - 1st Edition
$21
AEIC CG3-21
Published Date: 02/01/2022
Guide for Installation of Pipe-Type Cable Systems - 3rd Edition
$15
AEIC CG4-97
Published Date: 01/01/1997
Guide for Installation of Extruded Dielectric Insulated Power Cable Systems Rated 69 kV Through 138 kV - 2nd Edition
$15
AEIC CG5-05
Published Date: 06/01/2005
Underground Extruded Power Cable Pulling Guide
AEIC CS2-23
Published Date: 02/01/2023
Specification for Impregnated Paper and Laminated Paper Polypropylene Insulated High Pressure Pipe Type Cable - 8th Edition
$36