NR NR/L3/OPS/084 ISSUE 6 PDF

NR NR/L3/OPS/084 ISSUE 6 PDF

Name:
NR NR/L3/OPS/084 ISSUE 6 PDF

Published Date:
12/04/2021

Status:
[ Active ]

Description:

Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This work instruction defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved by axle counters, using the track circuit block regulations unless safety validation determines that an LCV process is not required.

The LCV process may additionally be employed in non-axle counter areas where a line clear procedure over and above that set out in GE/RT8000 or NR/OPS/NOI is deemed beneficial.

NOTE 1: Examples may include complex possessions or a series of possessions involving multiple vehicles entering or leaving the possession.

NOTE 2: It should be noted that conventional GE/RT8000 or NR/OPS/NOI processes for taking, managing and handing back possessions are not fully described within this document. This document does refer to the conventional processes to indicate where the LCV process enhances or interfaces with them

This work instruction is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied.

Purpose

The purpose of this work instruction is to manage the risk of vehicles and rail mounted plant being left on track following engineering possession subject to the Line Clear Verification (LCV) process being completed.

The LCV process supports the safe interim and final handback of a possession by providing a means of assessing that the line is clear in addition to conventional line clear procedures (as defined in GE/RT8000 or NR/OPS/NOI). The LCV process is based on the principle of a diverse means of proving the line clear and safe following engineering possession and is designed to align as closely as possible with established methods of working. 


Edition : 6
File Size : 1 file , 1.5 MB
Number of Pages : 27
Published : 12/04/2021

History

NR NR/L3/OPS/084 ISSUE 6
Published Date: 12/04/2021
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
$18.6
NR NR/L3/OPS/084 ISSUE 5
Published Date: 03/07/2020
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
$18.6

Related products

NR NR/L3/MTC/ME0201/CAL286 ISSUE 1
Published Date: 06/07/2008
Calibration of Megger BM200 Series Insulation & Continuity Tester
$5.7
NR NR/L3/MTC/II0219/05 ISSUE 1
Published Date: 09/04/2010
Maintenance of Assets Fitted with Remote Condition Monitoring
$7.5
NR NR/CIV/SD/807 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: Web Strengthening Trough Interface Type 4
$5.7

Best-Selling Products

FLBC FLAC CH 11
Published Date: 01/01/2007
2007 FLORIDA BUILDING CODE - Chapter 11 Florida Accessibility Code for Building Construction
$9
FLBC FLAC CH 11
Published Date: 01/01/2007
2007 FLORIDA BUILDING CODE - Chapter 11 Florida Accessibility Code for Building Construction
$9
FLBC FLAC CH 11
Published Date: 01/01/2004
2004 FLORIDA BUILDING CODE - Chapter 11 Florida Accessibility Code for Building Construction
$3
FLBC FLBAC
Published Date: 01/01/2014
2014 FLORIDA BUILDING CODE - Accessibility
$21
FLBC FLBAC
Published Date: 01/01/2020
2020 FLORIDA BUILDING CODE - Accessibility
$21.3
FLBC FLBAC
Published Date: 01/01/2017
2017 FLORIDA BUILDING CODE - Accessibility
$21.6