NR NR/L3/OPS/303 ISSUE 4 PDF

NR NR/L3/OPS/303 ISSUE 4 PDF

Name:
NR NR/L3/OPS/303 ISSUE 4 PDF

Published Date:
06/03/2017

Status:
[ Active ]

Description:

Possession of the Line for Engineering Work Delivery Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This work instruction applies to all Network Rail staff and applicable support services contractors that plan work engineering access and deliver requirements associated with taking a possession of the line for engineering work upon Network Rail’s managed infrastructure.

The scope of this work Instruction covers the management of any engineering train(s), On-Track Machines (OTM) and On-Track Plant (OTP) for:

a) maintenance;

b) renewals; and

c) major project activity associated with taking a possession of the line for engineering work.

The management of possession overrun risk is detailed in NR/L3/INI/CP0064 and NR/L3/MTC/MG0210.

Purpose

The purpose of this work instruction is (in conjunction with GE/RT8000/T3 Possession of the line for engineering work and associated Handbooks), to inform Network Rail staff and applicable support services contractors the responsibilities and delivery requirements associated with taking a possession of the line for engineering work. The work instruction reduces the potential for conflict between possessions and the operational railway during engineering work.

This work instruction will also standardise the methodology associated with generating a Pre-Possession (PICOP) Briefing Pack and provide the minimum content that the briefing pack should contain. The production of the briefing packs is mandatory for the setting up and delivery of possessions of the line for engineering work booked within the Weekly Operating Notice (WON).


Edition : 4
File Size : 1 file , 640 KB
Number of Pages : 26
Published : 06/03/2017

History


Related products

NR E10000/0/2F ISSUE B
Published Date: 02/17/1994
Typical Interlocking Circuits Cascade Timing (& 'Tollerton')
$5.7
NR NR/L3/TRK/002/D10 ISSUE 1
Published Date: 08/01/2007
Maintain Fencing & Boundary Measures
$5.7
NR NR/GN/OHS/00150 ISSUE 3
Published Date: 03/07/2009
Infection Control
$18.6
NR NR/SIN/205 ISSUE 3
Published Date: 01/30/2023
Survey of Small (16mm) Core WT Henley Insulator
$13.2

Best-Selling Products

AFGS AFGS-87219B
Published Date: 10/23/2012
Electrical Power Systems, Aircraft
$7.2
AFGS AFGS-87241A Notice 2 - Cancellation
Published Date: 05/15/2014
Simulators, Flight (No S/S Document)
$3.6
AFGS AFGS-87249 Notice 4 - Cancellation
Published Date: 10/28/2012
Mechanical Equipment and Subsystems, Requirements for the Integrity of (S/S by MIL-STD-1798)
$3.6
AFGS AFGS-87271A Notice 1 - Validation
Published Date: 04/24/2013
Engines, Unmanned Air Vehicle, Airbreathing Gas Turbine, Expendable
$3.6