NR NR/L3/OPS/303 ISSUE 4 PDF

NR NR/L3/OPS/303 ISSUE 4 PDF

Name:
NR NR/L3/OPS/303 ISSUE 4 PDF

Published Date:
06/03/2017

Status:
[ Active ]

Description:

Possession of the Line for Engineering Work Delivery Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This work instruction applies to all Network Rail staff and applicable support services contractors that plan work engineering access and deliver requirements associated with taking a possession of the line for engineering work upon Network Rail’s managed infrastructure.

The scope of this work Instruction covers the management of any engineering train(s), On-Track Machines (OTM) and On-Track Plant (OTP) for:

a) maintenance;

b) renewals; and

c) major project activity associated with taking a possession of the line for engineering work.

The management of possession overrun risk is detailed in NR/L3/INI/CP0064 and NR/L3/MTC/MG0210.

Purpose

The purpose of this work instruction is (in conjunction with GE/RT8000/T3 Possession of the line for engineering work and associated Handbooks), to inform Network Rail staff and applicable support services contractors the responsibilities and delivery requirements associated with taking a possession of the line for engineering work. The work instruction reduces the potential for conflict between possessions and the operational railway during engineering work.

This work instruction will also standardise the methodology associated with generating a Pre-Possession (PICOP) Briefing Pack and provide the minimum content that the briefing pack should contain. The production of the briefing packs is mandatory for the setting up and delivery of possessions of the line for engineering work booked within the Weekly Operating Notice (WON).


Edition : 4
File Size : 1 file , 640 KB
Number of Pages : 26
Published : 06/03/2017

History


Related products

NR E10000/0/2F ISSUE B
Published Date: 02/17/1994
Typical Interlocking Circuits Cascade Timing (& 'Tollerton')
$5.7
NR NR/L3/TRK/002/D10 ISSUE 1
Published Date: 08/01/2007
Maintain Fencing & Boundary Measures
$5.7
NR NR/GN/OHS/00150 ISSUE 3
Published Date: 03/07/2009
Infection Control
$18.6
NR NR/SIN/205 ISSUE 3
Published Date: 01/30/2023
Survey of Small (16mm) Core WT Henley Insulator
$13.2

Best-Selling Products

AN 3054
Published Date: 03/25/1988
Nut, Coupling, Electrical Conduit - INACTIVE for New Design after 4/15/98
AN 316
Published Date: 02/25/1991
Nut, Jam, Hexagon
AN 6021
Published Date: 02/01/1969
Gage, Panel Mounting Low Pressure Oxygen - with Notice 1, 12/88
AN 6235
Published Date: 11/04/1952
Filter Element - Hydraulic Replaceable Micronic Line Type - INACTIVE for NEW DESIGN - after 1/22/99
AN 6236
Published Date: 03/27/1951
Filter Element - Hydraulic Replaceable Micronic Reservoir
AN 6249
Published Date: 09/30/1959
Valve, 3000 PSI Hydraulic Check