NR NR/L3/RMVP/1006 ISSUE 2 PDF

NR NR/L3/RMVP/1006 ISSUE 2 PDF

Name:
NR NR/L3/RMVP/1006 ISSUE 2 PDF

Published Date:
06/02/2018

Status:
[ Withdrawn ]

Description:

Technical Audit Procedure for Plant and Traction and Rolling Stock

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This work instruction defines a procedure for technical auditing of Plant and T&RS as required by Network Rail.

This work instruction relates to the level 2 assurance process used by Heads of Plant and T & RS, the STE Plant & T&RS Audit Team.

Purpose

The Network Rail, Health and Safety Management System specifies an effective company-wide assurance and audit programme for the assessment of internal management system controls and external suppliers. This work instruction specifies the Plant and Traction and Rolling Stock (Plant and T&RS) assurance team’s audit process and gives guidance on the general principles for the planning and management of these audits. This work instruction documents the process which delivers consistent audit output thus allowing for effective risk identification.

Audits are a mandated management tool used to provide assurance that company policies and standards are being adhered to. Audits enable the identification of root causes of failure or weak processes and work practices. Audits are used to monitor Network Rail’s and its Suppliers’ management system controls to understand where and what improvement actions are necessary.

This procedure supports the Network Rail corporate assurance framework requirements specified in NR/L2/ASR/036 and NR/L2/RVE/0003. It is based on the guidance and principles of BS EN ISO 19011.


Edition : 2
File Size : 2 files , 1.3 MB
Number of Pages : 31
Published : 06/02/2018

History


Related products

NR T25243 ISSUE 1
Published Date: 09/04/2010
Lineside & On Track Typical Circuits Points Clamp Lock MK2 Detection Circuits for Use with Standard, In-Bearer & Hy-Drive Systems, Mechanisms Individually Detected (3), R.H.S.N.C - L.H. Mechanism, where D.C. Traction Immunity is Required
$5.7
NR BRS-SM 52599
Published Date: 02/13/1995
Parts Schedule for Mechanical Backdrive External to 4' on R.H.S Full Depth SGV Layout Point Machine Mounted on L.H.S
$5.7
NR BRS-SM 440/10 ISSUE A
Published Date: 09/22/1995
Standard Apparatus Case G.A. of Large Case Framework Typical Example of Battery Charger
$5.7
NR E10000/94/13 ISSUE A
Published Date: 09/01/1984
Power Supply - Somerton Reb Cubicle Layout
$5.7

Best-Selling Products