Name:
NR NR/L3/RVE/0167 ISSUE 1 PDF
Published Date:
08/26/2008
Status:
[ Inactive ]
Publisher:
Network Rail
The Procedure applies to the control of all OTP by the maintenance function.
This procedure does not apply to the control of Tampers, Stone Blowers, Ballast Regulators or other On-track Machines (OTM), which are covered by other procedures.
Purpose
This Standard Maintenance Procedure meets the requirements of the Train Operations Manual.
This Procedure defines the standard process, roles and responsibilities for the control on site of On Track Plant (OTP).
| Edition : | 1 |
| File Size : | 1 file , 210 KB |
| Number of Pages : | 23 |
| Published : | 08/26/2008 |