The procedure applies to the use of all RRVs and RMMMs, referred to as On-Track Plant (OTP) by Infrastructure Maintenance in a T3 possession (refer to GE/RT8000 module T3).
This procedure does not apply to the use of Tampers, Stone Blowers, Ballast Regulators or other On-Track Machines (OTM), which are dealt with by other procedures.
Purpose
This Level 3 procedure meets the requirements of TM/C 06 and TM/C 04.
This procedure describes how Infrastructure Maintenance undertakes unobtrusive and special monitoring of its OTP Operations.