NR NR/L3/SCO/311/03 ISSUE 3 PDF

NR NR/L3/SCO/311/03 ISSUE 3 PDF

Name:
NR NR/L3/SCO/311/03 ISSUE 3 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Technical Asset Management Meeting

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with The Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

The Technical Asset Management Meeting (TAMM) is held to:

a) Meet the requirements of this standard.

b) Review fleet engineering strategy, issues and risks with the intention of making recommendations and decisions that are aligned with Network Rail’s objectives and aspirations.

c) Provide a focal point for fleet engineering activity within SCO and as the interface to the Technical Authority Directorate through the Asset Technical Review.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 3
File Size : 1 file , 190 KB
Number of Pages : 8
Published : 03/05/2022

History

NR NR/L3/SCO/311/03 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Technical Asset Management Meeting
$7.5
NR NR/L3/SCO/311/03 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Technical Asset Management Meeting
$7.5
NR NR/L3/SCO/311/03 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Technical Asset Management Meeting
$7.5

Related products

NR NR/L3/TRK/002/D09 ISSUE 1
Published Date: 08/01/2007
Pest & Vermin Control
$5.7
NR NR/L2/SCO/306 ISSUE 5
Published Date: 03/05/2022
Disposal of Redundant Assets
$13.2
NR NR/FP C400 ISSUE 4
Published Date: 09/03/2011
Plant & Equipment Work Instructions: Maintenance of Electrical Installation & Transducer Connections for WheelChex Installations
$7.5
NR TI 130 ISSUE 1
Published Date: 02/01/2009
Post Commissioning Signal Works Testing
$5.7

Best-Selling Products

Handbook on the Investment Casting Process
Published Date: 01/01/1993
$12