NR NR/L3/SCO/311/11 ISSUE 2 PDF

NR NR/L3/SCO/311/11 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/11 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Level 1 Inspections

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module. 

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module defines the requirements for level 1 ‘in process’ inspections undertaken by the maintenance management function on the maintenance delivery function to provide self-assurance of SCO fleet conformity against this standard. 

The application of the requirements and procedures contained within this modulemitigate the following high level risks: 

a) the risks mitigated by the standard or control document; 

b) what the benefits of the standard or control document are; and 

c) the associated legislation the standard or control document helps to achieve compliance with.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 8
Published : 03/05/2022

History

NR NR/L3/SCO/311/11 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Level 1 Inspections
$7.5
NR NR/L3/SCO/311/11 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Level 1 Inspection
$7.5

Related products

NR NR/L3/TRK/002/F25 ISSUE 1
Published Date: 03/01/2008
Guard Board Maintenance
$5.7
NR BRS-ST 97/11 ISSUE B
Published Date: 10/23/1969
Label (Auto MK II B Terminations (49 - 52 & 105 - 106) Flashing Light (Z Column)
$5.7
NR NR/L2/ELP/27009/MOD C02 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF BICC DOUBLE CERAMIC BEAD SKIDDED NEUTRAL SECTION
$5.7
NR NR/L2/SIG/30014/D120/TS5-73 ISSUE 1
Published Date: 12/01/2012
Signalling Works Testing: Siemens ACM 100 Axle Counter System Test Specification
$7.5

Best-Selling Products