NR NR/L3/SCO/311/14 ISSUE 2 PDF

NR NR/L3/SCO/311/14 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/14 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Recording

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details requirements for the retention of maintenance records which document maintenance delivered to SCO assets which are required for audit and investigation.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 180 KB
Number of Pages : 8
Published : 03/05/2022

History

NR NR/L3/SCO/311/14 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Recording
$7.5
NR NR/L3/SCO/311/14 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Recording
$7.5

Related products

NR NR/L3/SIG/11235/G130/TC1002 ISSUE 1
Published Date: 03/04/2023
Signalling Intermediate Testing Handbook: Installation of a New BR Spec 867 Style TC Feed Set
$5.7
NR BRS-SM 359 ISSUE F
Published Date: 10/30/1996
End Posts for Insulated F.B. Rail Joints
$5.7
NR T28132 ISSUE 1
Published Date: 09/11/1997
Lineside & on Track Equipment Typical Circuits Signals & Indicators Position Light Shunting Signal with Route Indications Control and Proving
$5.7
NR NR/L2/P3M/223 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Cost and Commercial
$13.2

Best-Selling Products

FM Approvals 1011/1012/1013:2020
Published Date: 12/01/2020
Examination Standard for Deluge and Preaction Sprinkler Systems
$15
FM Approvals 1011/1012/1013
Published Date: 09/01/2009
Deluge and Preaction Sprinkler Systems
$15
FM Approvals 1020:2020
Published Date: 12/01/2020
Examination Standard for Automatic Water Control Valves
$15
FM Approvals 1020
Published Date: 04/01/2007
Automatic Water Control Valves
$15
FM Approvals 1021:2020
Published Date: 12/01/2020
Dry Pipe Valves
$15
FM Approvals 1021
Published Date: 11/01/1973
Dry Pipe Valves
$15