NR NR/L3/SCO/311/15 ISSUE 2 PDF

NR NR/L3/SCO/311/15 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/15 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Tools and Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details requirements for the tools and equipment required to deliver the maintenance plan including; calibration, storage to prevent damage and degradation and tractability of measurements.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure


Edition : 2
File Size : 1 file , 190 KB
Number of Pages : 6
Published : 03/05/2022

History

NR NR/L3/SCO/311/15 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Tools and Equipment
$7.5
NR NR/L3/SCO/311/15 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Tools and Equipment
$7.5

Related products

NR NR/L2/SIG/30009/A200 ISSUE 3
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$18.6
NR BRS-SW 67-F23 ISSUE 4
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Train Operated Warning System Interlocking B Section VII Circuits
$5.7
NR NR/CIV/SD/1083 ISSUE B
Published Date: 03/05/2011
Box Girder Underbridge Single Track 2 Girders & Double Track 3 Girders > 30 - 55 Degrees Skew Details Sheet 1 of 2
$5.7
NR NR/CIV/SD/610 ISSUE F
Published Date: 12/01/2018
Undertrack Crossing (UTX): Open Cut Method
$5.7

Best-Selling Products

AICHE B-2
Published Date: 01/01/1986
DIERS: Technology Summary Emergency Relief Systems for Runaway Chemical Reactions and Storage Vessels: A Summary of Multiphase Flow Methods
$19.5
AICHE B-3
Published Date: 01/01/1986
DIERS: Small/Large Scale Experimental Data and Analysis
$37.5
AICHE B-4
Published Date: 01/01/1986
DIERS: Bench-Scale Apparatus Design and Test Results Large Scale Polystyrene-Ethylbenzene High Viscosity Two-Phase Flow Test Report
$15
AICHE C-19
Published Date: 01/01/2001
CCPS: Making EHS an Integral Part of Process Design
$20.4
AICHE E-24
Published Date: 01/01/1987
TRAY DISTILLATION COLUMNS A Guide to Performance Evaluation
$7.5
AICHE E-29
Published Date: 04/29/1993
PARTICLE SIZE CLASSIFIERS
$19.5