NR NR/L3/SCO/311/18 ISSUE 2 PDF

NR NR/L3/SCO/311/18 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/18 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Reporting of Corrective Maintenance and Repairs

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module identifies the requirements for coding corrective maintenance (CM) and repair (REP) items in the Fleet Asset Management System (FAMS) to enable the production of accurate reliability data for trending and analysis.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On-Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 9
Published : 03/05/2022

History

NR NR/L3/SCO/311/18 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Reporting of Corrective Maintenance and Repairs
$7.5
NR NR/L3/SCO/311/18 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Reporting of Corrective Maintenance and Repairs
$7.5

Related products

NR NR/CIV/SD/2153-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 8.4m External Unit Left Skew 30°
$5.7
NR NR/L2/SIG/30014/D120/TS5-05 ISSUE 3
Published Date: 09/06/2014
Signalling Works Testing Handbook: Diode Track Circuit Signalling Works Test Specification
$5.7
NR TEF 3017 ISSUE 2
Published Date: 06/01/2008
Engineer's Visual Track Inspection Report
$5.7
NR NR/CIV/SD/1110 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Double Track 3 Girders & Single Track 2 Girders: Outer Girder Bearings Fixed End 21 M, 24 M & 27 M Spans
$5.7

Best-Selling Products

PDI BPSGI
Published Date:
Basic Principles for Sizing Grease Interceptors
PDI G 101
Published Date: 03/01/2010
Testing and Rating Procedure for Hydro Mechanical Grease Interceptors with Appendix of Installation and Maintenance
PDI G 102
Published Date:
Testing and Certification for Grease Interceptors with FOG Sensing and Alarm Devices
PDI GGI-EM
Published Date: 01/01/2010
Guide To Grease Interceptors: Eliminating the Mystery
PDI MGO
Published Date:
Model Grease Ordinance
PDI MSREPFS
Published Date: 01/01/2009
MINIMUMSPACE REQUIREMENTS FOR ENCLOSED PLUMBING FIXTURE SUPPORTS