NR NR/L3/SCO/313/SP-1.10 ISSUE 4 PDF

NR NR/L3/SCO/313/SP-1.10 ISSUE 4 PDF

Name:
NR NR/L3/SCO/313/SP-1.10 ISSUE 4 PDF

Published Date:
06/01/2024

Status:
[ Active ]

Description:

On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Route Knowledge

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Network Rail standard specifies the process for managing OTM driver route learning and the management of external route conductors. It includes the assessment of initial route learning and route knowledge retention for OTM drivers. 

 It is applicable to:

a) all Network Rail Directly Operated Fleet OTM drivers;

b) those involved in training OTM drivers 

c) those involved in assessing OTM drivers’ route knowledge

d) those involved in hiring in external route conductors 

Purpose 

This procedure defines the arrangements for the training, assessing and retention of route knowledge for On-Track Machine (OTM) drivers. 

The procedure also defines the arrangements for the managing the risks arising from the hiring in of External Route Conductors to undertake route conducting duties for Directly Operated Fleet (DOF).


Edition : 4
File Size : 2 files , 810 KB
Number of Pages : 19
Published : 06/01/2024

History

NR NR/L3/SCO/313/SP-1.10 ISSUE 4
Published Date: 06/01/2024
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Route Knowledge
$13.2
NR NR/L3/SCO/313/SP-1.10 ISSUE 3
Published Date: 12/04/2021
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Route Knowledge
$13.2
NR NR/L3/SCO/313/SP-1.10 ISSUE 2
Published Date: 12/01/2018
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Route Knowledge
$13.2

Related products

NR X01620 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Timing Circuits Double Line Bi-Directional where Trains May Stand on the Exit Track Circuit
$5.7
NR NR/FP C180 ISSUE 4
Published Date: 09/03/2011
Plant & Equipment Work Instructions: Electricity Supply Points, Distribution Cabinets Switchboards & Associated Cables Except Signalling Supplies
$7.5
NR NB 139 ISSUE 5
Published Date: 07/29/2021
Track Circuit Bonding in S&C
$7.5
NR R28120 ISSUE 1
Published Date: 09/11/1997
Route Relay Interlocking Typical Circuits Signals & Indicators First Filament Lamp Failure Proving Through Circuit
$5.7

Best-Selling Products

UNE-CEN ISO/TS 11133-1:2009
Published Date: 09/16/2009
Microbiology of food and animal feeding stuffs - Guidelines on preparation and production of culture media - Part 1: General guidelines on quality assurance for the preparation of culture media in the laboratory (ISO/TS 11133-1:2009)
UNE-CEN ISO/TS 11133-2:2006
Published Date: 05/10/2006
Microbiology of food and animal feeding stuffs - Guidelines on preparation and production of culture media - Part 2: Practical guidelines on performance testing of culture media (ISO/TS 11133-2:2003)
UNE-CEN ISO/TS 11135-2:2009 EX
Published Date: 09/02/2009
Sterilization of health care products - Ethylene oxide - Part 2: Guidance on the application of ISO 11135-1 (ISO/TS 11135-2:2008)
UNE-CEN ISO/TS 15874-7:2005
Published Date: 01/12/2005
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 7: Guidance for the assessment of conformity (ISO/TS 15874-7:2003)
UNE-CEN ISO/TS 15875-7:2005
Published Date: 01/12/2005
Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 7: Guidance for the assessment of conformity (ISO/TS 15875-7:2003)
UNE-CEN ISO/TS 15876-7:2005
Published Date: 01/12/2005
Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 7: Guidance for the assessment of conformity (ISO/TS 15876-7:2003)