NR NR/L3/SCO/313/SP-3.03 ISSUE 2 PDF

NR NR/L3/SCO/313/SP-3.03 ISSUE 2 PDF

Name:
NR NR/L3/SCO/313/SP-3.03 ISSUE 2 PDF

Published Date:
09/05/2020

Status:
[ Active ]

Description:

On-Track Machines (OTMs) Driver and Operations Standards Manual: Managing Fatigue in Safety Critical Workers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-sco-313-sp-3-03-issue-2_2776564

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

This module specifies the process to manage fatigue and working hours. It applies to all OTM Operations staff who undertake safety critical work and those who have

responsibility for the rostering and/or management of staff who undertake safety critical work.

Purpose

This module enables Network Rail to comply with Regulation 25 of the Rail and Other Guided Transport Systems (Safety) Regulations 2006.

The module provides guidance and details the requirements for a Fatigue Risk Management System (FRMS) using the ORR’s nine stage approach with basic

fatigue controls applicable to all OTM drivers.


Edition : 2
File Size : 1 file , 170 KB
Number of Pages : 9
Published : 09/05/2020

History

NR NR/L3/SCO/313/SP-3.03 ISSUE 2
Published Date: 09/05/2020
On-Track Machines (OTMs) Driver and Operations Standards Manual: Managing Fatigue in Safety Critical Workers
7.50 €
NR NR/L3/NSC/313/SP-3.03 ISSUE 1
Published Date: 12/05/2015
On-Track Machines (OTMs) Driver and Operations Standards Manual: Managing Fatigue in Safety Critical Workers
7.50 €

Related products

NR NR/GN/SIG/11115 ISSUE 4
Published Date: 08/26/2008
Correlation of Signalling Records
18.60 €
NR BR 1971 ISSUE 3
Published Date: 03/21/1991
Shunters Control Unit (Radio)
5.70 €
NR BR 1986
Published Date: 10/01/1990
Specification for Signal Lamps for Multi Aspect Colour Light Signals - Type SL35
7.50 €
NR NR/CIV/SD/16M/131 ISSUE C
Published Date: 09/02/2017
Non-Station Footbridges up to 16m (100 series): Main Span - Structural Details
5.70 €

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2