NR NR/L3/SIG/11231C ISSUE 15 PDF

NR NR/L3/SIG/11231C ISSUE 15 PDF

Name:
NR NR/L3/SIG/11231C ISSUE 15 PDF

Published Date:
12/05/2020

Status:
[ Revised ]

Description:

Signal Maintenance Testing Handbook (SMTH) Combined

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-sig-11231c-issue-15_2767457

Choose Document Language:
130.20 €
Need Help?
PDF ONLY

Signaling equipment that is replaced or renewed on a like for like basis under corrective maintenance, temporary design as a result of an incident or engineering  works and minor signaling renewals that do not affect the application logic of the system or, the controls of the system that have previously been tested to signal orks testing.

Purpose

This document contains the index to the Signal Maintenance Testing (NR/SMTH) The SMTH provides a maintenance testing regime for the replacement or installation of signaling equipment that does not affect the application logic of the system or, the controls of the system that have previously been tested to signal works testing.


Edition : 15
File Size : 1 file , 46 MB
Number of Pages : 1415
Published : 12/05/2020

History

NR NR/L3/SIG/11231C ISSUE 17
Published Date: 06/04/2022
Signal Maintenance Testing Handbook (SMTH) Combined
130.20 €
NR NR/L3/SIG/11231C ISSUE 16
Published Date: 09/04/2021
Signal Maintenance Testing Handbook (SMTH) Combined
130.20 €
NR NR/L3/SIG/11231C ISSUE 15
Published Date: 12/05/2020
Signal Maintenance Testing Handbook (SMTH) Combined
130.20 €
NR NR/L3/SIG/11231C ISSUE 14
Published Date: 03/07/2020
Signal Maintenance Testing Handbook (SMTH) Combined
130.20 €

Related products

NR R28060 ISSUE 1
Published Date: 09/11/1997
Route Relay Interlocking Typical Circuits Signals & Indicators Banner Repeater; Electro-Mechanical Type; Single. Proving Through Circuits
5.70 €
NR BRS-SM 571/17 ISSUE B
Published Date: 02/23/1994
Swing Nose Crossing Tie Rod for Drive Lock Mechanism
5.70 €
NR BRS-SM 597/1
Published Date: 03/18/1985
Hydraulically Operated Unlocked Yard Points Thrust Bracket & Baseplate
5.70 €
NR NR/L3/MTC/RCS0216/TEL13 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working in Attics & Roof Spaces
5.70 €

Best-Selling Products

API 062 (DP)
Published Date: 10/01/1990
An Historical Overview of Solid Waste Management in the Petroleum Industry
4.50 €
API 083 (RS)
Published Date: 08/01/1996
Octane Requirements of the Motor Vehicle Fleet and Gasoline Grade Sales
4.50 €
API 10A Addendum 1
Published Date: 04/01/2000
Addendum 1 - Specification for Cements and Materials for Well Cementing
API 10A Addendum 2
Published Date: 12/01/2000
Addendum 2 - Specification for Cements and Materials for Well Cementing - Also Incorporates Addendum 1
4.20 €
API 10B Addendum 1
Published Date: 10/01/1999
Addendum 1 - Recommended Practice for Testing Well Cements
API 10B Addendum 2
Published Date: 11/01/2000
Addendum 2 - Recommended Practice for Testing Well Cements