NR NR/L3/SIG/11235/G110 ISSUE 1 PDF

NR NR/L3/SIG/11235/G110 ISSUE 1 PDF

Name:
NR NR/L3/SIG/11235/G110 ISSUE 1 PDF

Published Date:
09/04/2021

Status:
[ Active ]

Description:

Signal Maintenance Testing Handbook: Testing of Extensive and Simultaneous and Functionally Equivalent Works, Using Signal Maintenance Testing Techniques

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to work that meets the selection criteria as defined in NR/L3/SIG/10064 NR/GI/T001. 

Intermediate Testing is the testing of signalling equipment that is replaced or renewed on an Extensive and Simultaneous like for like basis under planned works,and signalling renewals defined as Functionally Equivalent Works that have previously been tested to Signal Works Testing Handbook. 

Extensive and simultaneous covers the temporary disconnection and subsequent reconnection of signalling equipment, usually required in order to facilitate permanent way works, either in an emergency situation, or when works can be pre-planned. 

Where the volume and / or complexity of the testing is in excess of that which might reasonably be tested, managed and / or controlled by a G110 Tester / Lead Tester, then the use of G110 might not be appropriate. 

Typical applications are given in Appendix A.

Purpose

This module is part of the suite of documents contained within the Signalling Intermediate Testing Handbook, NR/L3/SIG/11235, which together detail the requirements for signalling intermediate testing activities.

This module defines the requirements which, when met, allow Signal Maintenance Testing techniques to apply to Functionally Equivalent Works and Signal Maintenance Testing works which are defined as Extensive and Simultaneous.

 


Edition : 1
File Size : 1 file , 390 KB
Number of Pages : 21
Published : 09/04/2021

History


Related products

NR NR/L2/ELP/27801 ISSUE 1
Published Date: 03/07/2020
Portable 25 kV Earths and Earth Continuity Jumpers
$18.6
NR NR/L3/MTC/RCS0216/MP06 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Lifting & Thimbling Operations
$5.7
NR NR/CIV/SD/2212-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details Cill Units
$5.7
NR NR/L3/ELP/27240/NR/DIST C22V ISSUE 1
Published Date: 03/01/2017
Routine Maintenance of ABB ZX0 11 kV Gas Insulated Switchgear
$5.7

Best-Selling Products

IEC/PAS 60027-6 Ed. 1.0 en:2004
Published Date: 09/20/2004
Letter symbols to be used in electrical technology - Control technology
$12.6
IEC/PAS 60050-732 Ed. 1.0 b:2007
Published Date: 06/06/2007
International Electrotechnical Vocabulary - Part 732: Computer network technology
$61.2
IEC/PAS 60092-510 Ed. 1.0 en:2009
Published Date: 04/29/2009
Electrical installations in ships - Part 510: Special features - High-voltage shore connection systems
$89.7
IEC/PAS 60099-7 Ed. 1.0 en:2004
Published Date: 04/27/2004
Surge arresters - Part 7: Glossary of terms and definitions from IEC publications 60099-1, 60099-4, 60099-6, 61643-1, 61643-12, 61643-21, 61643-311, 61643-321, 61643-331 and 61643-341
$95.1
IEC/PAS 60191-6-18 Ed. 1.0 en:2008
Published Date: 01/22/2008
Mechanical standardization of semiconductor devices - Part 6-18: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guide for ball grid array (BGA)
$29.1
IEC/PAS 60191-6-19 Ed. 1.0 en:2008
Published Date: 01/22/2008
Mechanical standardization of semiconductor devices - Part 6-19: Measurement methods of package warpage at elevated temperature and the maximum permissible warpage
$32.1