NR NR/L3/SIG/11235/G210 ISSUE 2 PDF

NR NR/L3/SIG/11235/G210 ISSUE 2 PDF

Name:
NR NR/L3/SIG/11235/G210 ISSUE 2 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to Functionally Equivalent Works that meet the selection criteria as defined in NR/L3/SIG/10064 NR/GI/T001, where a new G130 Test Plan is required. 

Purpose 

This module is part of the suite of documents contained within the Signalling Intermediate Testing Handbook, NR/L3/SIG/11235, which together detail the requirements for signalling intermediate testing activities. 

This module, in support of NR/L2/SIG/11235/G110, defines the requirements for the: 

• Production of a new G130 Test Plan; and 

• Acceptance by Network Rail of a new G130 Test Plan by Network Rail; and 

• Acceptance by Network Rail of a G120 Test Schedule for the Functionally Equivalent Works that requires a New G130 Test Plan; 

before testing on Network Rail signalling infrastructure can proceed in accordance with that new G130 Test Plan and the associated G120 Test Schedule. 


Edition : 2
File Size : 1 file , 300 KB
Number of Pages : 15
Published : 09/07/2024

History

NR NR/L3/SIG/11235/G210 ISSUE 2
Published Date: 09/07/2024
Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules
$13.2
NR NR/L3/SIG/11235/G210 ISSUE 1
Published Date: 09/04/2021
Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2

Related products

NR NR/L2/SIG/30097/APPC ISSUE 3
Published Date: 04/07/2014
Modular Signalling: Appendix C: System Functionality
$18.6
NR NR/L2/SIG/30014/D120/TS5-05 ISSUE 3
Published Date: 09/06/2014
Signalling Works Testing Handbook: Diode Track Circuit Signalling Works Test Specification
$5.7
NR BRS-SM 60/7
Published Date: 06/07/1974
Colour Light Signals Guard Rail Stanchion
$5.7
NR NR/L3/MTC/RCS0216/PR13 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Drainage/Toilets/septic Tanks
$5.7

Best-Selling Products