NR NR/L3/SIG/11303/2S25 ISSUE 1 PDF

NR NR/L3/SIG/11303/2S25 ISSUE 1 PDF

Name:
NR NR/L3/SIG/11303/2S25 ISSUE 1 PDF

Published Date:
03/05/2011

Status:
[ Active ]

Description:

Signalling Installation Points: Train Operated Point Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

This document details the method to be used for installing equipment associated with a Train Operated Points System on Network Rail infrastructure. Where only part of an existing system is being replaced, the relevant steps in this instruction can be used to supplement the information already provided in the SMTH.

The Train Operated Point System consists of a hydraulic unit mounted in the four foot adjacent to the toe of the normally closed switch, which maintains the switch in the closed position using the accumulator actuator, which applies a constant pressure to the switch. The whole mechanism is enclosed in a tough weatherproof case that is fixed in the four foot through holes pre-drilled in the sole plate.

To operate the points, the train wheel flange applies a pressure, greater than that applied by the accumulator which ‘drives' the points to the reverse position, thus known as ‘Train Operated Points'. The points can be cranked to the reverse position, by use of a hand pump unit, which is positioned adjacent to the accumulator, when in the reverse position the points require to be clipped and scotched in order to maintain the minimum switch opening.


Edition : 1
File Size : 1 file , 290 KB
Number of Pages : 9
Published : 03/05/2011

History


Related products

NR T00013 ISSUE 11
Published Date: 12/01/2007
Lineside & On Track Equipment Typical Circuits Index (4)
$5.7
NR NR/CIV/SD/1404 ISSUE E
Published Date: 09/02/2017
D-Type Underbridges: General Notes and H&S Risk Register
$5.7
NR SSI8003-20B ISSUE 6
Published Date: 04/01/2008
SSI Data Preparation - Panel Processor - Chapter B: Introductory Information (aka RT/SSI/8003-20B)
$13.2
NR BRS-SM 638
Published Date: 04/01/1992
Temporary Speed Restriction Warning Arrangements Fixed Clamp for ES Magnet Support
$5.7

Best-Selling Products

864 none
Published Date: 01/01/1996
Guidelines for Canadian Drinking Water Quality - Sixth Edition
$7.2