NR NR/L3/SIG/11303 ISSUE 9 PDF

NR NR/L3/SIG/11303 ISSUE 9 PDF

Name:
NR NR/L3/SIG/11303 ISSUE 9 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Signalling Installation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This standard applies to:

a) general installation techniques;

b) the installation of signalling works applicable to the Infrastructure, including temporary works; and

c) the installation of specific types of signalling systems and equipment, but not the train borne parts of track-to-train systems.

This standard also applies to maintenance work and repairs, including like-for-like replacement of equipment. However, reference shall also be made to the appropriate maintenance standards and Signal Maintenance Testing standards.

This standard does not cover:

a) the manufacture of individual items of equipment;

b) the installation of train borne equipment; or

c) Equipment ordering details and processes.

The presentation of design detail is the subject of NR/L2/SIG/11201.

The testing of signalling works is covered by NR/L2/SIG/30014.

The modules which form part of this specification represent the best historical practice for signalling installation which should be followed unless specified in other standards or approved as a superior practice by the responsible signalling project engineer.

An index of the modules is contained in Appendix A with a topic index in Appendix B. 

Purpose 

This standard requires that any installation of signalling equipment on Network Rail Managed Infrastructure provides: 

a) an operationally safe installation of new or altered systems and equipment, with safe interfaces between systems; 

b) that safe methods of work are adopted, with safe interfaces between all parties involved or affected; 

c) a correct and consistent interpretation of design detail; 

d) a neat and tidy appearance; 

e) compliance with the client’s specified requirements, so that the installation is dependable, fit for purpose and free from defect; 

f) adequate testability; and 

g) safe and easy maintenance.


Edition : 9
File Size : 1 file , 1.1 MB
Number of Pages : 92
Published : 06/04/2022

History

NR NR/L3/SIG/11303 ISSUE 9
Published Date: 06/04/2022
Signalling Installation
$24.3
NR NR/L3/SIG/11303 ISSUE 8
Published Date: 03/02/2019
Signalling Installation
$24.3

Related products

NR E10000/129/3 ISSUE A
Published Date: 08/01/1991
Ground Frame Controls (Mechanically Operated) - Inside Interlocking Areas (Route Setting)
$5.7
NR BR 1833 ISSUE 1
Published Date: 02/01/1982
Closed Circuit Television For Level Crossing Surveillance Multiplex Transmission Equipment
$13.2
NR X11710 ISSUE 2
Published Date: 09/03/2011
MCB-OD Typical Circuits Signal Control Circuits Single Route Signal (101)
$5.7
NR NR/L3/SIG/10661 ISSUE 26
Published Date: 06/01/2024
Signalling Maintenance Task Intervals
$18.6

Best-Selling Products

SA/SNZ HB 119:2019
Published Date: 12/20/2019
Mines and quarries electrical protection
$43.362
SA/SNZ HB 146:2018
Published Date: 05/23/2018
Management of electrical cable in mines and quarries
$30.492
SA/SNZ HB 168:2017
Published Date: 09/18/2017
Document control
$30.492
SA/SNZ HB 205:2017
Published Date: 06/30/2017
Managing health-and-safety-related risk
$23.562
SA/SNZ HB 252:2014
Published Date: 04/28/2014
Communications cabling manual - Module 3: Residential communications cabling handbook
$33.264
SA/SNZ HB 331:2020 Amd 1:2020
Published Date: 10/01/2020
Overhead line design handbook
Free Download