NR NR/L3/SIG/11761/D320 ISSUE 3 PDF

NR NR/L3/SIG/11761/D320 ISSUE 3 PDF

Name:
NR NR/L3/SIG/11761/D320 ISSUE 3 PDF

Published Date:
01/13/2012

Status:
[ Active ]

Description:

EBI Track 200 Modifications to Tuning Unit and ETU T1/T2 Connections and Trackside Wiring Recommendations - Application Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

INTRODUCTION1

TI21 Tuning Units and ETUs are known to be prone to connection problems at the T1/T2 terminals where the track tails are terminated onto the unit. Investigation has shown that the termination arrangements for the 10mm tail cable crimp can become slack owing to the ‘Back nut' becoming loose. The resulting loose connection causes degradation in performance, often leading to right side failure.

For new build Tuning Units and ETUs, Bombardier have altered the terminal arrangement to remove the ‘Back nut' and these units are identified by mod strike as follows:

New build TU with modification = mod strike 3

New build ETU with modification = mod strike 4

This application note contains:

• Instructions detailing how to modify the terminal arrangement of earlier TUs and ETUs to eliminate the slack back nut problem.

• Recommendations for Tuning Unit trackside wiring which will optimise pole/zero performance.

1 The illustrations in this application note are clearest when viewed in colour.


Edition : 3
File Size : 1 file , 500 KB
Number of Pages : 9
Published : 01/13/2012

History


Related products

NR T60262 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Train dispatch - Shunters Acceptance Plunger. Acc: Relay Interface Location Case Circuit
$5.7
NR NR/PS/ELP/27185 ISSUE 2
Published Date: 04/01/2006
25 KV A.C. Power Transformers and Voltage Regulators for Auxiliary Supplies
$18.6
NR NR/L3/MTC/RCS0216/TK11 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Working with Ballast - Regulate, Glue, Shoulder Clean, Contaminate, & Wet Beds
$5.7
NR RT/E/WI/00006 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Movable Bridges
$18.6

Best-Selling Products

NETA ATS-2009
Published Date: 02/19/2009
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2009 Edition
$247.5
NETA ATS-2013
Published Date: 2013
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2013 Edition
$82.5
NETA ATS-2017
Published Date: 2017
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2017 Edition (Errata Included)
$87
NETA ATS-2021
Published Date: 09/18/2020
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2021 Edition
$87
NETA ECS-2020
Published Date: 2020
Standard for Electrical Commissioning Specifications for Electrical Power Equipment and Systems, 2020 Edition
$57
NETA ECS-2024
Published Date: 2024
Standard for Electrical Commissioning Specifications for Electrical Power Equipment & Systems, 2024 Edition
$62.7