NR NR/L3/SIG/SG0054 ISSUE 3 PDF

NR NR/L3/SIG/SG0054 ISSUE 3 PDF

Name:
NR NR/L3/SIG/SG0054 ISSUE 3 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Corrective Maintenance of Signalling Assets

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure does not cover personal safety requirements.

This procedure is for the corrective maintenance of Network Rail direct maintained signalling assets. Assets owned by another function but have corrective maintenance undertaken by signalling (e.g. Hot Axle Bearing Detectors) are also covered.

For corrective maintenance to right on arrival and repeat failures, the process in NR/L3/SIG/SG0139 should be followed.

For corrective maintenance to wrong side failures, the process in NR/L3/SIG/SG0138 should be followed.

This procedure does not cover preventative maintenance; this is detailed in NR/L3/SIG/SG0053.

This procedure applies to you if you are involved with the management and delivery of corrective maintenance on signalling equipment.

Purpose

The purpose of this document is to define the process for corrective maintenance of Network Rail signalling assets.


Edition : 3
File Size : 1 file , 600 KB
Number of Pages : 12
Published : 08/26/2008

History


Related products

NR BRS-SM 854/2
Published Date: 06/01/1986
Apparatus Case Large & Small Mounting Block for Yale Lock
$5.7
NR NR/L3/OCS/043/5.9 ISSUE 1
Published Date: 03/01/2008
National Control Instructions: Fires
$7.5
NR X70022 ISSUE 3
Published Date: 12/05/2009
MCB Typical Circuits (CCTV Only) Barrier Indication and Video Control Circuits
$5.7
NR RT/ETE/5/A/1
Published Date: 03/17/1998
Disconnecting Link Box for Use on Lifting Bridges
$5.7

Best-Selling Products

VDI/VDE/ATV 3552 - DRAFT
Published Date: 10/01/2006
Draft Document - Use of field bus systems in water supply plants