Name:
NR NR/L3/SIG/SG0059 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Inactive ]
Publisher:
Network Rail
This document applies to all preventative and corrective maintenance carried out on cables and wires which come within the scope of Network Rail standard NR/L2/SIG/11655. Individual role and position responsibilities for this procedure are detailed in the RACI.
Purpose
To effectively manage the consequences of degradation of insulation in signalling wires and cables and to meet the requirements of NR/L2/SIG/11655.
This procedure details the responsibilities within the Maintenance organisation for the requirements of NR/L2/SIG/11655 and should be read in conjunction with this standard.
| Edition : | 2 |
| File Size : | 1 file , 590 KB |
| Number of Pages : | 12 |
| Published : | 08/26/2008 |