NR NR/L3/SIG/SG0093 ISSUE 2 PDF

NR NR/L3/SIG/SG0093 ISSUE 2 PDF

Name:
NR NR/L3/SIG/SG0093 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Inactive ]

Description:

Signalling Equipment Affected by Emergency or Temporary Speed Restrictions

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

All scenarios requiring the disconnection and subsequent reconnection of signalling equipment in association with emergency and temporary speed restrictions are included.

As the process covers maintenance responsibilities only, the process for disconnection and subsequent reconnection of signalling equipment in association with emergency and temporary speed restrictions by any function other than maintenance is not covered. Reference should be made to the individual functions procedures for details of their process.

This procedure is part of a suite of documents; reference should be made to the applicable document:

• NR/L3/SIG/SG0093. Signalling equipment affected by emergency and temporary speed restrictions

• NR/L3/SIG/MG0110. Imposition and removal of emergency and temporary speed restrictions.

• NR/L3/SIG/SG0111. Design of emergency and temporary speed restrictions.

This procedure will only apply to those post holders who are involved in any aspect of the initiation or removal of an emergency or temporary speed restriction for maintenance purposes. Individual role and position responsibilities for this procedure are detailed in the RACI.

Purpose

This procedure details the process for situations where the imposition of an emergency or temporary speed restriction will result in existing signalling warning equipment (e.g. automatic warning systems or automatic train protection) giving contrary or misleading indications to the driver of an approaching train to that of the warning system associated with the speed restriction.


Edition : 2
File Size : 1 file , 170 KB
Number of Pages : 17
Published : 08/26/2008

History


Related products

NR R28051 ISSUE 1
Published Date: 06/20/2009
Route Relay Interlocking Typical Circuits Signals & Indicators Signal in Rear of Banner Repeater Fed From Interlocking
$5.7
NR NR/L3/MTC/ME0201/CAL299 ISSUE 1
Published Date: 06/07/2008
Calibration of Megger BM80 Series Digital Insulation & Continuity Testers
$5.7
NR NR/L2/SIG/11201/MOD A4-10 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Operation and Maintenance Details
$7.5
NR X08310 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Indication Control Unit Construction (2) - Rear View
$5.7

Best-Selling Products

APA 3D-001
Published Date: 11/01/2006
APA Full-Scale House Test Project: Progress Report 1
APA 3D-002
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 2
APA 3D-003
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 3
APA 3D-004
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 4
APA 3D-005
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 5
APA 3D-007
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 7