NR NR/L3/SIG/SG0111 ISSUE 3 PDF

NR NR/L3/SIG/SG0111 ISSUE 3 PDF

Name:
NR NR/L3/SIG/SG0111 ISSUE 3 PDF

Published Date:
09/03/2011

Status:
[ Inactive ]

Description:

Design of Emergency and Temporary Speed Restrictions

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

The procedure identifies the process and allocates responsibilities for the design of both emergency and temporary speed restriction that are requested by maintenance.

This procedure covers maintenance responsibilities only. The process for design of an emergency or temporary speed restriction by any function other than maintenance is not covered in this document. Reference should be made to other functional procedures for details of their process.

This procedure is part of a suite of documents; reference should be made to the applicable document:

NR/L3/SIG/SG0093: Signalling equipment affected by emergency and temporary speed restrictions

NR/L3/SIG/MG0110: Imposition and removal of emergency and temporary speed restrictions.

NR/L3/SIG/SG0111: Design of emergency and temporary speed restrictions.

This procedure will only apply to those post holders who are involved in any aspect of the initiation or removal of an emergency or temporary speed restriction for maintenance purposes. Individual role and position responsibilities for this procedure are detailed in the RACI.

Purpose

This procedure identifies the process and allocates responsibilities for the design of both emergency and temporary speed restriction that are requested by maintenance.


Edition : 3
File Size : 1 file , 160 KB
Number of Pages : 11
Published : 09/03/2011

History


Related products

NR X00028 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Methods to Overcome Potential Timing Problems (1)
$5.7
NR NR/L3/TEL/30162 ISSUE 3
Published Date: 09/03/2022
Work Instruction for Jointing, Terminating, and Testing Optical Fibre Cables
$18.6
NR BRS-SM 2562
Published Date: 02/13/1995
Mechanical Backdrive Mounted in 4' on LHS in 3rd Rail Areas Full Depth FV Layouts Point Machine Mounted on RHS
$5.7
NR NR/FP C040 ISSUE 5
Published Date: 09/04/2021
Fixed Plant Work Instructions: Fixed Standby Diesel Generators
$7.5

Best-Selling Products

NFSI B101.0-2017
Published Date: 01/11/2017
Walkway Surface Auditing Procedure for the Measurement of Walkway Slip Resistance
$19.5
NFSI B101.0-2021
Published Date: 03/12/2021
Walkway Surface Auditing Procedure for the Measurement of Walkway Slip Resistance
$19.5
NFSI B101.1-2009
Published Date: 10/13/2009
Test Method for Measuring Wet SCOF of Common Hard-Surface Floor Materials
$18
NFSI B101.1-2020
Published Date: 2020
Test Method for Measuring Wet SCOF of Common Hard-Surface Floor Materials
$18
NFSI B101.2-2020
Published Date: 2020
Test Method for Determining the Impact on Wet Coefficients of Friction of Various Chemical or Physical Walkway Surface Cleaners and Treatments on Common Hard-Surface Flooring Materials
$18
NFSI B101.3-2012
Published Date: 01/18/2012
Test Method for Measuring Wet DCOF of Common Hard-Surface Floor Materials
$18