NR NR/L3/SIG/SG0155 ISSUE 2 PDF

NR NR/L3/SIG/SG0155 ISSUE 2 PDF

Name:
NR NR/L3/SIG/SG0155 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Management of Isolation, Re-Sets & Restoration on Axle Counter Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The procedure covers all types of axle counter equipment used on Network Rail infrastructure and applies to Network Rail maintenance staff who undertake preventative or corrective maintenance on this type of equipment. Individual role/responsibilities for this procedure are detailed in the RACI.

Purpose

This document details the procedure for the isolation of axle counter equipment from the interlocking for preventative or corrective maintenance activities along with the re-set and restoration of the equipment back to the interlocking.


Edition : 2
File Size : 1 file , 620 KB
Number of Pages : 12
Published : 08/26/2008

History


Related products

NR NR/L2/TEL/30073 ISSUE 2
Published Date: 03/07/2009
Specification for the Maintenance of Driver-to-Signalbox Radio Systems (CSR & SMA)
$13.2
NR E10016/15 ISSUE 3
Published Date: 09/01/2004
Typical Circuits Former Western Region Point Machines Electrical Detection Standard WR Applications (including Clamp Locks)
$5.7
NR NR/CIV/SD/4460 ISSUE 2
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Full Structure Sections & Elevations Sheet 1
$5.7
NR T34250 ISSUE 1
Published Date: 02/07/2004
Lineside & on Track Equipment Typical Circuits TPWS/RETB - Driver Operated Level Crossing Controls
$5.7

Best-Selling Products

UNE-CEN/TS 1099:2009 EX
Published Date: 06/24/2009
Plywood - Biological durability - Guidance for the assessment of plywood for use in different use classes
UNE-CEN/TS 12169:2009 EX
Published Date: 10/28/2009
Criteria for the assessment of conformity of a lot of sawn timber
UNE-CEN/TS 12200-2:2004
Published Date: 11/12/2004
Plastics rainwater piping systems for above ground external use - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity
UNE-CEN/TS 12201-7:2007 EX
Published Date: 05/23/2007
Plastics piping systems for water supply - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity
UNE-CEN/TS 12390-9:2008 EX
Published Date: 05/07/2008
Testing hardened concrete - Part 9: Freeze-thaw resistance - Scaling
UNE-CEN/TS 13001-3-1:2006 EX
Published Date: 06/14/2006
Cranes - General design - Part 3-1: Limit states and proof of competence of steel structures