NR NR/L3/TEL/0023 ISSUE 3 PDF

NR NR/L3/TEL/0023 ISSUE 3 PDF

Name:
NR NR/L3/TEL/0023 ISSUE 3 PDF

Published Date:
03/06/2010

Status:
[ Withdrawn ]

Description:

Management of SINCS Records for Telecoms Assets

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This process applies to you if:

• You work in Network Rail Control as a controller or manager.

• You manage or supervise operational telecommunication fault teams or technical support staff.

• You manage or supervise operational signalling fault teams or technical support staff.

• You attend operational telecommunication failures as per SMTH, TMT & FIP

• You investigate operational telecommunication failures as per SMTH, TMT & FIP

• You check or review operational telecommunication failures.

• You check or review SINCS records.

Purpose

The purpose of this procedure is to define the management of the SINCS sign off process for telecoms assets maintained by Network Rail maintenance staff.


Edition : 3
File Size : 1 file , 320 KB
Number of Pages : 13
Published : 03/06/2010

History


Related products

NR T60019 ISSUE 2
Published Date: 10/07/2005
Lineside & On Track Equipment Typical Circuits Signals SD 321 Signal (3/ 4 Aspect) ACC: Electronic Interface (Pot/ Clam) Peripheral Location Circuit
$5.7
NR NR/L3/ELP/27240/NR/DIST C22M ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of 11kV Oil Circuit Breaker South Wales Switchgear Type C4X
$5.7
NR T04302 ISSUE 1
Published Date: 01/03/2014
LINESIDE AND ON-TRACK EQUIPMENT TYPICAL CIRCUITS - TRACK CIRCUITS EBI TRACK 200 TU TUNED ZONES - G.A
$5.7
NR T25121 ISSUE 3
Published Date: 06/05/1999
Lineside & on Track Equipment Typical Circuits Points Power Points, Control & Combined Detection, (Clamp Lock Type) Two Locations, Location 2
$5.7

Best-Selling Products

The Macintosh Bible
Published Date: 10/01/1998
$10.5