NR NR/L3/TEL/30066 ISSUE 1 PDF

NR NR/L3/TEL/30066 ISSUE 1 PDF

Name:
NR NR/L3/TEL/30066 ISSUE 1 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Energisation of Fixed Radio Frequency Transmitter Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard applies to: 

a) New or upgraded fixed transmitters on Network Rail land or property, whether mounted on towers, buildings or other structures. 

b) Fixed or temporary sites proposed to be installed adjacent to the operational railway. 

c) New and upgraded fixed 3rd party radio transmitters within 100m of Network Rail track or buildings. 

d) In-building systems

e) Point-to-point communications systems.

f) New and upgraded fixed transmitters in or close to a railway tunnel.

This standard does not apply to train borne radio and telecommunication systems.

Purpose 

Radio transmitters can cause various direct (biophysical) and indirect health effects and potentially interfere with Network Rail managed operational systems, including Signalling & Telecommunications (S&T) systems. 

This Work Instruction specifies the requirements for testing new and upgraded radio antenna systems for compliance with the process specified in NR/L2/TEL/30066. 

The clearance process provided in this standard is designed to reduce the risk of fixed radio frequency transmitters adversely affecting people and systems to as low as reasonably practicable (ALARP)


Edition : 1
File Size : 1 file , 820 KB
Number of Pages : 33
Published : 06/04/2022

History


Related products

NR BR 1620 ISSUE 2
Published Date: 04/20/1993
Specification for the Development of Equipment for the Inductive Loop Warning System ILWS
$52.2
NR NR/L3/MTC/RCS0216/SIG08 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working on Ground Frames
$5.7
NR NR/CIV/SD/443 ISSUE G
Published Date: 06/01/2019
Footbridges Non-Stations: Ramp - CHS Support - 180 Degree Turn
$5.7
NR NR/L3/OPS/045/3.01 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.01: Level Crossings - Keeping a Record of Telephone Calls
$7.5

Best-Selling Products

PTI C30.1
Published Date: 01/01/2003
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 1 - FIELD FUNDAMENTALS
$21.9
PTI C30.1S
Published Date: 01/01/2006
ENTRENAMIENTO Y CERTIFICACIÓN DE PERSONAL DE CAMPO PARA POSTENSADO SIN TENDONES ADHERENTES
$21.9
PTI C30.2
Published Date: 01/01/2002
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - IRONWORKER
PTI C30.3
Published Date: 01/01/2006
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - POST-TENSIONING INSPECTOR
$29.4
PTI C30.4 ERTA
Published Date: 01/14/2022
Training and Certification of Field Personnel for Multistrand & Grouted Post‐Tensioning Student Manual
$0.3
PTI C30.4
Published Date: 02/01/2007
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR BONDED POST-TENSIONING