NR NR/L3/TRK/002/A06 ISSUE 3 PDF

NR NR/L3/TRK/002/A06 ISSUE 3 PDF

Name:
NR NR/L3/TRK/002/A06 ISSUE 3 PDF

Published Date:
03/01/2008

Status:
[ Active ]

Description:

S&C - Detailed Inspection of Switches

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Includes: Switches identified as requiring inspection in accordance with NR/L2/TRK/053

Excludes: Catch points, unless used in a facing direction, half-sets of trap points which are in the open position for ordinary running, switch diamonds, visual inspection of switches during supervisors visual track inspections.


Edition : 3
File Size : 1 file , 120 KB
Number of Pages : 8
Published : 03/01/2008

History


Related products

NR NR/PS/ELP/21023 ISSUE 2
Published Date: 12/01/2005
Rectifier DC Disconnector Switch for DC Traction Substations
$18.6
NR BR 961 ISSUE 6
Published Date: 09/01/1982
Specification for Miniature Twin Tractive Armature A.C. Immune D.C. Biased Neutral Line Relay Unit, Plug-In Type, for Railway Signalling Purposes
$18.6
NR E10001/31 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits Aspect Replacement
$5.7
NR NR/L2/CTM/012/017 ISSUE 1
Published Date: 03/06/2010
SIG 17: Undertake Corrective and Preventative Maintenance of Absolute Block Systems
$7.5

Best-Selling Products

CEPT T/R 34-01
Published Date: 01/01/1987
Specifications Des Equipements Radioelectriques Mobiles Maritimes
$12.6
CEPT T/SF 66 E
Published Date: 01/01/1990
Services and Facilities Aspects of Digital European Cordless Telecommunications (DECT)
$1.5