Name:
NR NR/L3/TRK/1015 ISSUE 5 PDF
Published Date:
12/07/2019
Status:
[ Revised ]
Publisher:
Network Rail
The processes described in these modules of this standard apply to the management of inspection by the following methods on running lines and sidings as applicable:
a) Track Patrolling
b) Track Inspection by PLPR System
Future modules include:
c) Risk Base Maintenance Regimes
d) Design Patrolling
Purpose
This modularised standard describes the management of Basic Visual Inspection by patrolling or other recognised alternative methods of providing tier 1 Safety Inspections (see Figure 1 – Hierarchy of track inspection NR/L2/TRK/001). Each recognised method’s process is described to achieve a consistent approach across the network to maintain the reliability and quality of Basic Visual Inspection and develop the skills and competence of staff.
| Edition : | 5 |
| File Size : | 1 file , 460 KB |
| Number of Pages : | 9 |
| Published : | 12/07/2019 |