NR NR/L3/TRK/1020 ISSUE 1 PDF

NR NR/L3/TRK/1020 ISSUE 1 PDF

Name:
NR NR/L3/TRK/1020 ISSUE 1 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Track Hand Back for Projects: Confirming Track Is Safe for Opening at the Selected Line Speed After Projects Engineering Work

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard covers the requirements when appointing and assessing competent individuals and when evaluating the compliance of the infrastructure prior to handing it back into use by trains. This standard applies where the Entry into Service process falls into the Track discipline for a project stage or as a single discipline project.

It applies to both Network Rail and the Supply Chain and covers Projects Engineering Works which could impact the integrity and safety of both the infrastructure and the vehicles which use it.

Exclusions 

This standard does not cover; 

1) normal Day to Day Maintenance work undertaken by maintenance teams; covered by the scope of NR/L2/TRK/001/mod13; 

2) authority to give up line blockages and other requirements described by the Rule Book or NR/L2/OHS/019; 

3) removing TSRs that have been imposed solely for the protection of staff; 

4) removing ESRs which have been applied in connection with hot weather Critical Rail Temperature management where no work was required to rectify any hot weather related faults; 

5) raising a PSR, although this standard can support, the requirements are covered in NR/L2/SIG/30021; 

6) responding to initial reports of geotechnical related failure or civils asset strike; covered by the scope of NR/L2/TRK/001/mod13.

Purpose 

The purpose of this standard is to help mitigate the risks to the safe passage of trains by assessing the compliance of the infrastructure prior to opening it into use. This is required following delivery of Project Engineering Works, including any preparatory or follow-up works to support this. 

The benefits of the standard are that it provides clear and consistent requirements and guidance to those accountable and responsible for all elements of confirming infrastructure compliance and handing back of track infrastructure into use by trains. 

Complying with the requirements will assist with achieving compliance with elements of Railway and Other Guided Transport Systems (Safety) Regulations 2006 [ROGS] in particular the delivery of Safety Critical Work (Appendix A) and the management of risk elements of The Construction (Design and Management) Regulations 2015. 


Edition : 1
File Size : 1 file , 5.5 MB
Number of Pages : 25
Published : 12/03/2022

History


Related products

NR NR/GN/CIV/100/05 ISSUE 1
Published Date: 12/05/2020
Strategic Design Manual: Heritage: Care and Development
$35.4
NR NR/CIV/SD/820 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: Top Flange Strengthening Details (1 of 3)
$5.7
NR TWI 2P012 ISSUE 3
Published Date: 02/01/2014
How to Inspect, Adjust and Maintain Adjustment Switches
$13.2
NR NR/L1/CIV/195 ISSUE 2
Published Date: 03/05/2022
Management of Escalator and Moving Walk Assets
$13.2

Best-Selling Products

IEC/TS 60034-16-2 Ed. 1.0 b:1991
Published Date: 02/15/1991
Rotating electrical machines - Part 16: Excitation systems for synchronous machines - Chapter 2: Models for power system studies
$33
IEC/TS 60034-16-3 Ed. 1.0 b:1996
Published Date: 02/14/1996
Rotating electrical machines - Part 16: Excitation systems for synchronous machines - Section 3: Dynamic performance
$43.5
IEC/TS 60034-17 Ed. 3.0 b:2002
Published Date: 03/26/2002
Rotating electrical machines - Part 17: Cage induction motors when fed from converters - Application guide
$18.3
IEC/TS 60034-17 Ed. 4.0 b:2006
Published Date: 05/09/2006
Rotating electrical machines - Part 17: Cage induction motors when fed from converters - Application guide
$47.1
IEC/TS 60034-18-32 Ed. 1.0 b:1995
Published Date: 03/29/1995
Rotating electrical machines - Part 18: Functional evaluation of insulation systems - Section 32: Test procedures for form-wound windings - Electrical evaluation of insulation systems used in machines up to and including 50 MVA and 15 kV
$18.3
IEC/TS 60034-18-33 Ed. 1.0 b:1995
Published Date: 03/29/1995
Rotating electrical machines - Part 18: Functional evaluation of insulation systems - Section 33: Test procedures for form-wound windings - Multifactor functional evaluation - Endurance under combined thermal and electrical stresses of insulation systems used in machines up to and including 50 MVA a
$32.1