Name:
NR NR/L3/TRK/1301 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Withdrawn ]
Publisher:
Network Rail
The Procedure applies to the planning of train borne grinding as a slow moving train, by maintenance teams at all levels.
This procedure DOES NOT apply to grinding undertaken by hand or in-possession grinding including switch and crossing train borne grinding.
Purpose
This Procedure defines the standard process, roles and responsibilities for the planning of plain line rail grinding using train borne equipment together with associated preparatory and follow-up work, on the network.
| Edition : | 2 |
| File Size : | 1 file , 250 KB |
| Number of Pages : | 18 |
| Published : | 08/26/2008 |