NR NR/L3/TRK/1302 ISSUE 2 PDF

NR NR/L3/TRK/1302 ISSUE 2 PDF

Name:
NR NR/L3/TRK/1302 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Withdrawn ]

Description:

Planning of Train Borne Grinding Works in Possession

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

The Procedure applies to the planning of train borne grinding in possession, by maintenance teams at all levels.

This procedure DOES NOT apply to grinding undertaken by hand or in-traffic.

Purpose

This Procedure defines the standard process, roles and responsibilities for the planning of plain line and S&C rail grinding using train borne equipment together with associated preparatory and follow-up work on the network.


Edition : 2
File Size : 1 file , 280 KB
Number of Pages : 19
Published : 08/26/2008

History


Related products

NR BRS-SM 37/10
Published Date: 08/22/1974
Form of Letters and Digits for Legends on Signal Identification Plates
$5.7
NR TWI 3G116 ISSUE 1
Published Date: 03/01/2005
How to Use Powered Trolleys
$5.7
NR NR/L3/MTC/RCS0216/SIG05 ISSUE 3
Published Date: 09/03/2022
Risk Control Manual: Working on Electrical Apparatus (Relay Rooms, REBs & IECCs Location Cases)
$5.7
NR BRS-SM 637/2
Published Date: 01/01/1990
Temporary Speed Restriction Warning Arrangements Centre Plate for Clamp for Magnet Support
$5.7

Best-Selling Products

CMAA 70-04
Published Date: 01/01/2004
Specifications for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2010
Published Date: 2010
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2020
Published Date: 2020
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
$31.5
CMAA 74-2004
Published Date:
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2010
Published Date: 2010
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2020
Published Date: 2020
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
$31.5