Name:
NR NR/L3/TRK/3012 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Active ]
Publisher:
Network Rail
This procedure applies to the management of hot weather precautions relating to track within the maintenance organisation.
This procedure details the posts responsible within the maintenance organisation for arranging that actions are taken where non-compliances are identified.
This procedure is applicable to all Network Rail staff who are responsible for inspection and maintenance of track.
It does not include arrangements for the management of:
• renewals sites
• works by non track functions, or
• Civil Engineering.
These groups will have their own management documents.
Purpose
This Standard Maintenance Procedure details the roles and responsibilities within the Maintenance organisation in the management of weather precautions relating to hot weather situations.
The procedure addresses the implementation and requirements of:
NR/L2/TRK/001 Inspection and maintenance of permanent way
NR/L2/TRK/3011 Continuous Welded Rail (CWR) Track
NR/L2/TRK/102 Track Construction Standard
NR/WI/TRK/001 Track Inspection Handbook
NR/L3/TRK/3011 Management of rail stress and critical rail temperature
| Edition : | 2 |
| File Size : | 1 file , 390 KB |
| Number of Pages : | 13 |
| Published : | 08/26/2008 |