NR NR/L3/TRK/3105 ISSUE 1 PDF

NR NR/L3/TRK/3105 ISSUE 1 PDF

Name:
NR NR/L3/TRK/3105 ISSUE 1 PDF

Published Date:
03/03/2012

Status:
[ Inactive ]

Description:

Topographic, Engineering, Land and Measured Building Surveying - Overhead Line Electrification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
INACTIVE * PDF ONLY

This Network Rail standard specifies requirements for surveys of OLE for which a co-ordinated Engineering, or Topographic survey is required. It excludes routine maintenance surveys already covered by other standards.

Requirements for individual project scopes are detailed in Table 3 of this standard.

The appropriate parts of this standard are intended to be used with NR/GN/TRK/3103 to identify the relevant survey methodology appropriate to the GRIP stage.

The types of OLE surveys related to GRIP are given in Table 3. A matrix of survey requirements is given in Appendix C.

Purpose

This standard facilitates the creation of a specification for Topographic survey works for overhead line equipment (OLE). It provides guidance to Project managers and Designated project engineers on specifying and commissioning Topographic surveys where the accuracy needs are better than +/–100 mm in position.

It is intended to be used with NR/L2/TRK/3100, Topographic, Engineering, Land and Measured building surveying – Strategy and general.

Guidance on the various survey techniques most appropriate for the GRIP Stages are found in the NR/GN/TRK/3103, Survey and mapping techniques.

The standard is not intended to include OLE maintenance measurement activities or duplicate standards that already exist, nor provide detail on remedial works for electrification design apart from satisfying the topographic survey requirements to enable that design.


Edition : 1
File Size : 1 file , 2.4 MB
Number of Pages : 59
Published : 03/03/2012

History


Related products

NR NR/FP C100 ISSUE 5
Published Date: 09/04/2021
Fixed Plant Work Instructions: Functional Supply Points (FSPs)
$5.7
NR NR/SMS/PART/L ISSUE 11
Published Date: 12/02/2023
Signal Maintenance Specifications (SMS): PART L
$25.5
NR NR/L3/TEL/30181/005 ISSUE 1
Published Date: 03/05/2016
Telecoms Maintenance Work Instructions: Northgate Call Touch
$5.7
NR E10000/2/4 ISSUE D
Published Date: 02/01/1993
Block Circuits Emergency Alarm on Physical Lines (in Trad. Signal Box)
$5.7

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
$19.5
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
$8.7