NR NR/L3/TRK/3407 ISSUE 3 PDF

NR NR/L3/TRK/3407 ISSUE 3 PDF

Name:
NR NR/L3/TRK/3407 ISSUE 3 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Management of Rail Welding

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This SMP describes the activities which shall be implemented to confirm that the specification of site and rail conditions relating to both aluminothermic and arc welding are accurately defined and communicated effectively. This procedure also establishes the framework for technical and managerial review of weld quality.

This procedure does not cover the physical welding processes as defined in NR/L2/TRK/0032 – Joining of rails by aluminothermic welding and NR/L2/TRK/0132 – Maintenance Arc Welding of Rails, Switches and Crossings

Anyone in this document undertaking welding must have attended and passed a Network Rail approved training course and hold the relevant competency.

Anyone in this document undertaking weld inspection must have attended and passed a Network Rail approved training course and shall hold a valid certificate of competency.

Purpose

This procedure applies to all aluminothermic and arc welding activities. It sets out the arrangements through which Network Rail complies with the minimum requirements for the management of rail welding on the permanent way, and of any consequent actions.


Edition : 3
File Size : 1 file , 380 KB
Number of Pages : 13
Published : 08/26/2008

History


Related products

NR SMF/MG/477 ISSUE 1
Published Date: 06/06/2015
Works Delivery Manager Activity Management Self Assurance Form
$5.7
NR E10000/3/16 ISSUE A
Published Date:
Signal Controls in Semaphore Area Fibre Optic Banner in Mechanical Area
$5.7
NR NR/L3/OPS/045/4.08 ISSUE 2
Published Date: 01/06/2024
National Operating Procedure (NOP) 4.08: Reporting of Dangerous Goods Incidents
$5.7
NR BRS-SM 637/1
Published Date: 01/01/1990
Temporary Speed Restriction Warning Arrangements Side Plate for Fixed & Adj. Clamp - ESM Support
$5.7

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants