NR NR/L3/TRK/7012 ISSUE 1 PDF

NR NR/L3/TRK/7012 ISSUE 1 PDF

Name:
NR NR/L3/TRK/7012 ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Critical Rail Temperature Management for Projects

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard applies to all projects and the organisations working on projects that change, renew, enhance or remove Network Rail infrastructure assets. This standard does not apply to works undertaken by the maintenance organisation.

This standard applies to any works which affect the track system. Examples include but are not limited to:

• track renewals / remodeling

• line side or under track excavations (by any discipline)

• installation of rail joints and closure rails

• lifting & lining the track

• temporary or permanent works requiring temporary removal of ballast profile (e.g. construction of platforms, signal bases, under track crossings or other structures)

• installation of cable management sleepers into existing consolidated track and other similar isolated disturbances

• recovery of troughing routes

• drainage works

• any works elsewhere in the railway system that could affect the stability of the track (e.g. piling etc.)

Purpose

The purpose of this standard is to provide procedures for the identification, recording and management of sites requiring Critical Rail Temperature (CRT) determined by NR/L2/TRK/001/mod14, to manage track in hot weather and mitigate the risk of track buckle given in the bow tie NR/GN/TRK/8001/0403 whilst undertaking activities covered in scope of this standard.


Edition : 1
File Size : 1 file , 970 KB
Number of Pages : 37
Published : 12/05/2020

History


Related products

NR NR/L3/ELP/27237 ISSUE 26
Published Date: 09/07/2024
Overhead Line Work Instructions
$130.2
NR NR/CIV/SD/FORMB/ADD/101 ISSUE P3
Published Date: 09/05/2009
Form B Addendum: Brickwork & Masonry Repair Details
$5.7
NR T28285 ISSUE 3
Published Date: 02/04/2006
Lineside & on Track Equipment Typical Circuits Signals & Indicators Aspect Sequence; Transition from 3 to 4 aspect; Approach Control Permitted
$5.7
NR NR/SMS/PART/L ISSUE 11
Published Date: 12/02/2023
Signal Maintenance Specifications (SMS): PART L
$25.5

Best-Selling Products