NR NR/PRC/MPI/CI0010 ISSUE 1 PDF

NR NR/PRC/MPI/CI0010 ISSUE 1 PDF

Name:
NR NR/PRC/MPI/CI0010 ISSUE 1 PDF

Published Date:
04/03/2006

Status:
[ Inactive ]

Description:

Procedure for Categorisation and Acceptance of Method Statements for MP&I "Civils" Works

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INAC * PDF ONLY

The provisions of this Standard Project Procedure shall apply to all MP&I Civils programmes and projects from April 2006, and is mandatory on activities for which MP&I Civils Programme are accountable, including:

• Renewals

• Maintenance

• Minor Works

• Bridgeguard 3

• SEC / SAC

• Unplanned Works

• Vehicle Incursion Prevention Works

• Emergency Works

Purpose

The purpose of this Standard Project Procedure is to provide a standardised MP&I Civils process for the acceptance of Method Statements across all five territories. Categorisation of Method Statements will enable an appropriate level of verification and checking to be adopted in the acceptance of Method Statements by Network Rail.

The Network Rail Company Procedure RT/E/P/02009 ‘Engineering Management of Projects' provides a high level definition of the of the principle actions to be taken by Network Rail and Contractor personnel responsible for managing the engineering aspects of infrastructure projects. Notwithstanding the obligations placed on the parties there are currently different approaches being taken in the territories to the acceptance of Method Statements and hence the need for a consistent national approach.

This Standard Project Procedure shall be read in conjunction with relevant Network Rail Company Standards and Health & Safety Systems Manual Procedures (Section 6) concerning the production, approval and acceptance of Method Statements.

This Standard Project Procedure is intended to ensure that suitable and sufficient Method Statement controls are in place based on the level of risk in accordance with the Management of Health and Safety at Work Regulations (1999) , Construction (Design and Management) Regulations 1994, RT/LS/S/008 Network Rail Contract Requirements – Safety, RT/LS/S/015 Contract Requirements – Environment.

This Standard Project Procedure recognises that as a prerequisite all Contractor's undertaking physical works on Network Rail's Controlled Infrastructure shall have an approved Contractors Assurance Case that demonstrates their capability, commitment and competence to undertake the defined work.


Edition : 1
File Size : 1 file , 140 KB
Number of Pages : 10
Published : 04/03/2006

History


Related products

NR X72110 ISSUE 3
Published Date: 12/05/2009
MCB Typical Circuits (CCTV Only) CCTV Fuse and Link Detail (Relay Rack Layout)
$5.7
NR NR/GN/CIV/203 ISSUE 1
Published Date: 10/01/2007
Evaluation & Assessment of Earthworks
$7.5
NR NR/EPF/OLE/019 ISSUE 1
Published Date: 06/01/2016
Key Role Checklist
$5.7
NR NR/L3/ELP/27240/NR/DIST C23C ISSUE 2
Published Date: 03/01/2017
Routine Testing of GEC MIDOS Type MVAJ13 Tripping and Control Relay
$5.7

Best-Selling Products

AOAC METHODS
Published Date: 01/01/2002
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2007
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1990
AOAC OFFICIAL METHODS OF ANALYSIS
$135
AOAC METHODS
Published Date: 01/01/1995
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2006
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1999
AOAC OFFICIAL METHODS OF ANALYSIS