NR NR/PRC/MPI/PP03.2 ISSUE 1 PDF

NR NR/PRC/MPI/PP03.2 ISSUE 1 PDF

Name:
NR NR/PRC/MPI/PP03.2 ISSUE 1 PDF

Published Date:
10/30/2006

Status:
[ Inactive ]

Description:

Manage the Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

This procedure shall apply:

  • When monitoring the plan – please see Section 4.1
  • When Updating the plan with actuals – please see Section 4.2
  • When performing schedule / resource analysis – please see Section 4.3
  • When using the PEND process – please see Section 4.4
  • When evaluating a portfolio – please see Sections 4.5
  • When evaluating the consequences of change to the portfolio – please see Section 4.6
  • When preparing for unauthorised GRIP stages – please see Section 4.7
  • When assigning P3e methodologies for unauthorised stages – please see Section 4.8
  • When building the stage plan from scratch – please see section 4.9
  • When performing schedule / resource analysis to unauthorised stages – please see section 4.10
  • When performing the PEST process – please see Section 4.11

Purpose

This document describes the process and procedures that shall be used to manage a project plan throughout authorised work phases and during non-authorised phase development.

This procedure is to be implemented within the Major Projects & Investment function and applies only to those projects that are delivered by Major Projects & Investment.


Edition : 1
File Size : 1 file , 240 KB
Number of Pages : 36
Published : 10/30/2006

History


Related products

NR BRS-SW 67-F16 ISSUE 2
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Train Operated Warning System Section III Location
$5.7
NR NR/L3/MTC/EN0100 ISSUE 3
Published Date: 06/02/2012
Waste Management
$18.6
NR NR/L2/ASR/036 ISSUE 7
Published Date: 03/02/2024
Assurance Framework
$18.6
NR NR/L3/ELP/27240/NR/DIST C29E ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of Portable Earthing Equipment - P&B Type for Outdoor High Voltage Equipment
$5.7

Best-Selling Products

SFSA 3
Published Date: 01/01/1976
Ultrasonic Testing of Steel Castings
$0.3
SFSA 4
Published Date: 01/01/1979
Fracture Toughness in Relation to Steel Castings Design and Application
$0.3
SFSA 5
Published Date: 01/01/1964
Solidification of Steel Castings
$15
SFSA 6
Published Date: 01/01/1973
Steel Foundry Melting Practice
$15
SFSA 7
Published Date: 01/01/1982
Gating and Risering
$15
SFSA 8
Published Date: 01/01/1984
Steel Casting Metallurgy
$15