NR NR/PRC/MPI/TK0022 ISSUE 1 PDF

NR NR/PRC/MPI/TK0022 ISSUE 1 PDF

Name:
NR NR/PRC/MPI/TK0022 ISSUE 1 PDF

Published Date:
12/07/2005

Status:
[ Inactive ]

Description:

Critical Rail Temperature (CRT) Management Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This procedure shall be applied to all Plain-Line and Switches & Crossings Track Renewals, and associated works, undertaken by Network Rail, through the National Contracts delivered by the Programme Director (Track) for MP&I.

Purpose

The purpose of this document is to define procedures that are to be followed for the identification, recording and management of sites requiring CRT management by MP&I track Renewals. This procedure does not have precedence over the requirements of RT/CE/S/011.

Note - Both documents must be read in conjunction with each other. If discrepancies are identified, then precedence shall go to RT/CE/S/011. MP&I's Programme Engineering Manager (Track) will provide a single point of contact for clarification of requirements.


Edition : 1
File Size : 1 file , 190 KB
Number of Pages : 19
Published : 12/07/2005

History


Related products

NR X21150 ISSUE 1
Published Date: 02/04/1995
ABCL STANDARDS RAIL SIGNAL CIRCUITS SINGLE LINE
$5.7
NR NR/GN/OTK/5000 ISSUE 4
Published Date: 09/07/2024
Index of Off-Track and Drainage Drawings
$13.2
NR X70016 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits General Guidelines (2)
$5.7
NR NR/L3/MTC/RCS0216/GA11 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working with & Mixing Concrete
$5.7

Best-Selling Products

ACC RC14001:2008
Published Date: 02/29/2008
Responsible Care 14001 Technical Specification
ACC RC14001:2015
Published Date: 09/25/2015
Responsible Care 14001 Technical Specification
ACC RC14001:2023
Published Date: 02/15/2023
Responsible Care 14001 Technical Specification