NR NR/PRC/MTC/ME0168 ISSUE 1 PDF

NR NR/PRC/MTC/ME0168 ISSUE 1 PDF

Name:
NR NR/PRC/MTC/ME0168 ISSUE 1 PDF

Published Date:
04/01/2007

Status:
[ Inactive ]

Description:

Initial Response to Incidents Involving On-Track Plant

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

This procedure concerns accidents, incidents and equipment defects involving OTP when on Network Rail infrastructure. It does not cover locomotives, wagons, tampers, stone blowers, ballast regulators or other on-track machines (OTM), which are covered by other procedures.

This procedure deals with the immediate and local management aspects of OTP incident management and is in addition to those actions mandated by the relevant GE/RT 8000 Rule Book modules and route control procedures.

The provisions of this procedure are in addition and complement those required by other company standards.

Purpose

This procedure defines the standard process, roles and responsibilities and operational control measures for the initial management ‘in possession' incidents involving On Track Plant (OTP) on the Network Rail infrastructure.

Final authority for incident management and any associated arrangements remains with Network Rail Route Control.


Edition : 1
File Size : 1 file , 420 KB
Number of Pages : 23
Published : 04/01/2007

History


Related products

NR BRS-SM 2261/3 ISSUE D
Published Date: 10/14/1991
Rail Clamp Point Lock - Lock Arm Type E6 for UIC-54/113A Plain Lead Switches
$5.7
NR NR/L2/ELP/27009/MOD C04 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF SOLID 3/16" COPPER WINDSTAY DROPPERS
$5.7
NR BRS-SE 5168
Published Date:
Position Light Signals Lens Conversion Kits for WB&SCO Westlyte Signal E12423
$5.7
NR NR/CIV/SD/1250 ISSUE E
Published Date: 12/01/2018
Z-Type Underbridges: Steelwork Protective Treatment: Notes
$5.7

Best-Selling Products