NR NR/PRC/MTC/ME0169 ISSUE 1 PDF

NR NR/PRC/MTC/ME0169 ISSUE 1 PDF

Name:
NR NR/PRC/MTC/ME0169 ISSUE 1 PDF

Published Date:
04/01/2007

Status:
[ Inactive ]

Description:

Monitoring of on Track Plant Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

The procedure applies to the use of all RRVs and RMMMs, referred to as On-Track Plant (OTP) by Maintenance in a T3 possession (refer to GE/RT8000 module T3).

This procedure does not apply to the use of Tampers, Stone Blowers, Ballast Regulators or other On-Track Machines (OTM), which are dealt with by other procedures.

Purpose

This Standard Maintenance Procedure meets the requirements of TM/C 06 and TM/C 04.

This procedure describes how Network Rail undertakes unobtrusive and special monitoring of OTP Operations being undertaken within the maintenance function of Network Rail.


Edition : 1
File Size : 1 file , 360 KB
Number of Pages : 11
Published : 04/01/2007

History


Related products

NR SSI8003-51B ISSUE 6
Published Date: 12/04/2010
SSI Data Preparation - Communication with Other Interlockings - Chapter B: Introduction and Simpler Boundaries (aka RT/SSI/8003-51B)
$13.2
NR NR/L2/SIG/30009/E042 ISSUE 1
Published Date: 06/03/2023
Signalling Principles Handbook: Absolute Block
$18.6
NR TWI 3B015 ISSUE 1
Published Date: 03/01/2005
How to Glue Ballast
$5.7
NR SF/CTM/303B ISSUE 1
Published Date: 06/05/2010
Trainer Feedback and Approval
$5.7

Best-Selling Products

VG 95370-10
Published Date: 12/01/1983
Electromagnetic Compatibility; Electromagnetic Compatibility of & in Systems - Test Method for Interference Currents
VG 95374-1
Published Date: 11/01/1992
Electromagnetic Compatibility (EMC) including Electromagnetic Pulse (EMP) and Lightning Protection - Program and Procedures - Administrative Regulations