NR NR/PRC/MTC/TK0001 ISSUE 1 PDF

NR NR/PRC/MTC/TK0001 ISSUE 1 PDF

Name:
NR NR/PRC/MTC/TK0001 ISSUE 1 PDF

Published Date:
02/01/2006

Status:
[ Inactive ]

Description:

Rail Testing Using Sperry Equipped Ultrasonic Test Unit (SE-UTU)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This procedure applies to all track segments where SE-UTU is to be used for Ultrasonic Testing using techniques U15 and U16 on full depth plain rail sections. This procedure does not apply for Ultrasonic Testing of Switches and Crossings or other planed rail sections.

This procedure relies upon the contractual arrangements in place between Network Rail and Sperry Rail Ltd.

A pre-requisite of this procedure is that the resources and budget are in place to allow the transition from manual testing to the use of SE-UTU Ultrasonic Testing.

Purpose

This document defines the process for replacing compliant pedestrian ultrasonic testing with an ultrasonic testing regime using a Sperry Equipped Ultrasonic Test Unit (SE-UTU).


Edition : 1
File Size : 1 file , 300 KB
Number of Pages : 20
Published : 02/01/2006

History


Related products

NR E10000/1/22 ISSUE A
Published Date: 03/07/1980
Signal Control Circuits - Delayed Yellow Typical Examples (2)
$5.7
NR NR/L2/CIV/086/MOD08 ISSUE 1
Published Date: 09/02/2017
Management of Earthworks Manual: Earthwork Temporary Restraint Selection and Implementation
$13.2
NR BRS-SE 196
Published Date: 05/19/1989
Flashing Light Unit Hood, Primary for Lifting Barrier (Auto) Mk II B
$5.7
NR NR/CIV/SD/2241 ISSUE C
Published Date: 09/02/2017
Conarch Overbridge: General Arrangement Road Surfacing And Waterproofing Details Sheet 1
$5.7

Best-Selling Products