NR NR/SIG/10665/MOD 017 ISSUE 1 PDF

NR NR/SIG/10665/MOD 017 ISSUE 1 PDF

Name:
NR NR/SIG/10665/MOD 017 ISSUE 1 PDF

Published Date:
03/02/2013

Status:
[ Withdrawn ]

Description:

Reliability Centred Maintenance of Signalling Equipment (ROSE) - Miniature Stop Light Crossing (MSL) Test Plan (NR/ROSE/LX74/1)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

GENERAL

This test plan is in addition to NR/ROSE/LC/A7/1. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes' by each task so that particular item of the test can be correctly recorded as per the index in ‘crossing defects'.

To perform the annual test the following documents will be required:

• The crossing ground plan

• The level crossing order

• The crossing control tables

• The signalling plan

Missing documentation shall be listed as a defect.


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 9
Published : 03/02/2013

History


Related products

NR BRS-SM 694/2
Published Date: 10/01/1981
Reed Track Circuit Cable Clips Pressure Pad for Fixing to Concrete Sleepers
$5.7
NR NR/L2/SIG/11774/SR0001SD ISSUE 1
Published Date: 06/02/2012
Clamp Lock Standard Tools (aka NR/L2/SIG/11774/A118)
$5.7
NR E10000/2/2 ISSUE A
Published Date: 03/10/1980
Block Circuits One Acceptance Type (Welwyn Control)
$5.7
NR RT/SIN/070 ISSUE 1
Published Date: 10/01/1998
BR 998 Electrical Detectors (aka NR/SIN/070)
$7.5

Best-Selling Products

FAO/WHO FAO8876
Published Date: 01/01/2003
Food Quality and Safety Systems: A Training Manual on Food Hygiene and the Hazard Analysis and Critical Control Point (HACCP) System
$15