NR NR/SIN/165 ISSUE 1 PDF

NR NR/SIN/165 ISSUE 1 PDF

Name:
NR NR/SIN/165 ISSUE 1 PDF

Published Date:
09/15/2017

Status:
[ Withdrawn ]

Description:

Special Inspection of AOCL/AOCL+B and ABCL Level Crossings Including Power Supplies

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This SIN applies to those Routes with:

a) Automatic Barrier Level Crossing Locally monitored (ABCL) level crossings;

b) Automatic Open Level Crossing Locally monitored (AOCL) level crossings; or

c) AOCL plus barriers (AOCL + B) level crossings.

Purpose

The purpose of this Special Inspection Notice (SIN) is to:

a) Review the power supply arrangements in place at all types of automatic locally monitored level crossings.

b) Evaluate the practicality of remote condition monitoring of the power supply system, and key sub-systems whose failure can have the same effect as loss of power supply, at all locally monitored level crossings, so that prompt action can be taken to manage the failure.


Edition : 1
File Size : 1 file , 610 KB
Number of Pages : 18
Published : 09/15/2017

History


Related products

NR NR/SIN/208 ISSUE 1
Published Date: 05/20/2022
Survey and Correlation of IP Connected Signalling and Telecoms Equipment
$13.2
NR RT/ETE/1/A/12
Published Date: 05/19/1998
General Arrangements of Conductor Rail Side Ramp
$5.7
NR BRS-SM 694
Published Date: 06/01/1982
Reed Track Circuit Cable Clips General Assembly for Fixing to Concrete Sleepers
$5.7
NR TWI 3B003 ISSUE 1
Published Date: 03/01/2005
How to Understand Blanket Design
$5.7

Best-Selling Products

Nanomedicine : Basic Capabilities
Published Date: 10/01/1999
$29.7