NR NR/SIN/192 ISSUE 2 PDF

NR NR/SIN/192 ISSUE 2 PDF

Name:
NR NR/SIN/192 ISSUE 2 PDF

Published Date:
12/14/2020

Status:
[ Withdrawn ]

Description:

Dorman Phantom Aspect Mitigation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This SIN applies to signals fitted with Dorman LED signal heads (all varieties) that perform the function of a mid-platform or platform starting signal, i.e. on a platform or less than 200m beyond a platform;

NOTE: The highest risk is where drivers regularly stop in the same position which coincides with the position a phantom aspect can be witnessed. Stopping positions at non-platform starting signals is less regular therefore the likelihood is lower.

It does not apply to:

a) signals fitted with TPWS TSS;

b) signals fitted with CD or RA indicators;

c) signals that do not perform the function of a mid-platform or platform starting signal.

NOTE: This is because the consequence is lower or the risk of occurrence is mitigated, and all other Dorman LED signals will be subject to a routine maintenance task including a check that it is aligned in accordance with NB 179 within 4 years.

Purpose

The purpose of this Special Inspection Notice (SIN) is to check that all Unipart Dorman signals that have a high safety and performance risk of displaying a phantom aspect from reflected light (from any source of sufficient luminosity) are aligned in accordance with guidance provided in NB 179. A HAZID was undertaken to identify the highest risk signals and the results are shown in Appendix C.

NB179 supersedes guidance within NR/L2/SIG/10158 Appendices C.11.2 and C.12.2, SIN120 and TI151.


Edition : 2
File Size : 1 file , 590 KB
Number of Pages : 14
Published : 12/14/2020

History

NR NR/SIN/192 ISSUE 2
Published Date: 12/14/2020
Dorman Phantom Aspect Mitigation
$13.2
NR NR/SIN/192 ISSUE 1
Published Date: 08/18/2020
Dorman Phantom Aspect Mitigation
$13.2

Related products

NR TEF 3281 ISSUE 1
Published Date: 12/05/2020
Press Switch Adjustment Form
$5.7
NR NR/CIV/SD/4335 ISSUE A
Published Date: 03/07/2020
Ribbon Open Footbridge Series 4300: Back Elevation
$5.7
NR NR/L2/ELP/27009/MOD C04 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF SOLID 3/16" COPPER WINDSTAY DROPPERS
$5.7
NR BRS-SW 67-F10 ISSUE 2
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Train Operated Warning System - Layout Diagram for Sheets F11 to F23
$5.7

Best-Selling Products

TCA CTI 2012
Published Date: 2012
2012 TCA Handbook for Ceramic, Glass, and Stone Tile Installation
$12.6
TCA CTI 2013
Published Date: 2013
2013 TCNA Handbook for Ceramic, Glass, and Stone Tile Installation - Version 2013.1
TCA CTI
Published Date: 01/01/2008
2008 TCA Handbook for Ceramic Tile Installation
TCA CTI
Published Date: 2009
2009 TCA Handbook for Ceramic Tile Installation
TCA CTI
Published Date: 2010
2010 TCA Handbook for Ceramic Tile Installation
TCA CTI
Published Date: 2011
2011 TCA Handbook for Ceramic, Glass, and Stone Tile Installation