NR NR/SIN/196 ISSUE 1 PDF

NR NR/SIN/196 ISSUE 1 PDF

Name:
NR NR/SIN/196 ISSUE 1 PDF

Published Date:
07/29/2020

Status:
[ Active ]

Description:

Risk Assessment and Inspection of Longitudinal Bearer Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-sin-196-issue-1_2761994

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

Scope

This SIN applies to all longitudinal bearer systems (sometimes known as waybeams, wheel-timbers and longitudinal timbers) on Network Rail infrastructure. It includes longitudinal bearer systems in platforms and on bridges.

This SIN focuses on the LBS only and does not include the ‘structure’ that supports longitudinal bearer systems managed by the RAM (Structures).

NOTE: NR/L2/TRK/3038 defines the area of responsibility for bridges which carry longitudinal bearer systems.

Purpose

Following recent failures of Longitudinal Bearer Systems (LBS) the purpose of this SIN is to

a) understand the existing risk level presented by LBS;

b) prioritise the tactile inspection of the highest risk assets;

c) instigate a deliverable plan of work to manage the risk presented by LBS; and

d) provide assurance to the business that the risks from longitudinal bearer systems are reduced to as low a level as possible.


Edition : 1
File Size : 1 file , 490 KB
Number of Pages : 18
Published : 07/29/2020

History


Related products

NR NR/L3/MTC/RCS0216/TEL10 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Digital Transmission Systems
5.70 €
NR E10001/25 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits ULSRs
5.70 €
NR NR/L3/OCS/044/FS-38D ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: the Suggested Content of a Safe Method of Work
5.70 €
NR NR/L3/SIG/11235/G130/AR1002 ISSUE1
Published Date: 09/04/2021
Signal Maintenance Testing Handbook: Temporary Bonding Out of Rails (and Reinstatement)
5.70 €

Best-Selling Products

2023 ISPE Drug Shortages Prevention Model
Published Date: 05/01/2023
45.00 €
APQ Guide: Change Management (CM) System
Published Date: 02/01/2022
154.50 €
APQ Guide: Cultural Excellence
Published Date: 11/01/2022
154.50 €