NR NR/SP/ELP/21041 ISSUE 2 PDF

NR NR/SP/ELP/21041 ISSUE 2 PDF

Name:
NR NR/SP/ELP/21041 ISSUE 2 PDF

Published Date:
12/01/2005

Status:
[ Active ]

Description:

Specification of batteries and battery charging equipment for electrification applications

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This specification applies to all new batteries and battery charging equipment installed on the A.C. and D.C. Electrified Lines.

Purpose

This specification states the requirements for the design, manufacture and testing of batteries and battery charging equipment for use in substations and at other similar locations to provide supplies for tripping, closing, protection and control of electrical switchgear and associated electrical distribution equipment.

The document is to be read in conjunction with the relevant procurement specification.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 26
Published : 12/01/2005

History


Related products

NR TWI 2S015 ISSUE 1
Published Date: 03/01/2005
How to Recognise Bolt Failure
$5.7
NR NR/CIV/SD/1702 ISSUE D
Published Date: 12/01/2018
Concrete Underbridges: General Notes and H&S Risk Register
$5.7
NR BRS-SM 245 ISSUE A
Published Date: 06/25/1974
Connection Rods Long Jaw with Fishplate End - Insulated (Vertical Flange)
$5.7
NR NR/CIV/SD/16M/132 ISSUE C
Published Date: 09/02/2017
Non-Station Footbridges up to 16m (100 series): Main Span - Lifting Options & Drainage Details
$5.7

Best-Selling Products

IDEMA H7-94
Published Date: 01/01/1994
Sign Convention Standard
IDEMA H8-94
Published Date: 01/01/1994
Glossary of Suspension Terms Purpose
IDEMA R1-98
Published Date: 01/01/1998
HDD Handling Environment Assessment & Simulation Test Procedure using Test Tailoring
$13.8
IDEMA T11-91
Published Date: 01/01/1991
Window Margin