NR NR/SP/ELP/27205 ISSUE 2 PDF

NR NR/SP/ELP/27205 ISSUE 2 PDF

Name:
NR NR/SP/ELP/27205 ISSUE 2 PDF

Published Date:
04/01/2006

Status:
[ Active ]

Description:

Installation and Operation of Buffer Sections and Permanently Earthed Sections in AC Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-sp-elp-27205-issue-2_2765957

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

This document encompasses all Permanently Earthed Sections (P.E.S.) as defined in sub sections 5.1 and 5.2 below. It interprets and amplifies NR/SP/ELP/29987 Working on or about 25kV A.C. Electrified Lines in respect of P.E.S. but does not modify those instructions. Neutral Sections are specifically excluded from this document.

Purpose

This document details the installation and operational requirements for Buffer Sections and Permanently Earthed Sections on A.C. Overhead Line equipment.


Edition : 2
File Size : 1 file , 130 KB
Number of Pages : 8
Published : 04/01/2006

History


Related products

NR NR/CIV/SD/3027 ISSUE P1
Published Date: 09/05/2009
Sheet 8 of 15 Reinforcement Details for Foundation & Precast Beam
5.70 €
NR NR/L2/CTM/012/006 ISSUE 1
Published Date: 03/06/2010
SIG 06: Undertake Corrective and Preventative Maintenance of Axle Counters
7.50 €
NR RT/ETE/5/3/4
Published Date: 03/17/1998
Typical Arrangement of Cross & Intertrack Bonds on Plain Line with Track Circuits
5.70 €
NR NR/L2/TEL/30160 ISSUE 3
Published Date: 09/03/2022
Specification for Loose-Tube Optical Fibre Network Design
24.30 €

Best-Selling Products