NR NR/WI/TRK/3403 ISSUE E1 PDF

NR NR/WI/TRK/3403 ISSUE E1 PDF

Name:
NR NR/WI/TRK/3403 ISSUE E1 PDF

Published Date:
06/01/2006

Status:
[ Withdrawn ]

Description:

Requirements for Installation of Temporary Clamped Rail Joints for Line Speeds Above 50Mph and Up to 80Mph (aka NR/WI/TRK/03403)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-wi-trk-3403-issue-e1_2764919

Choose Document Language:
13.20 €
Need Help?
W/D * PDF ONLY

The application of the instruction is limited to a 6 month trial by the MP&I Track Programme's High Output renewals team.

The special requirements of this instruction apply at locations of work undertaken by MP&I Track Programme's High Output renewals team on Western Territory, where the Permissible Speed (PS) or planned Temporary Speed Restriction (TSR) is above 50 mph but does not exceed 80 mph. On high cant deficiency curves, the Enhanced Permissible Speed (EPS) shall either be withdrawn or reduced to a maximum of 150 mm of cant deficiency.

The instruction applies to the use of Robel 68.05 clamps (Design 3) in conjunction with 850mm long fishplates manufactured by Corus Cogifer. A compliant Joint is illustrated in Appendix A.

Purpose

This instruction defines the requirements for installing temporary clamped rail joints using Robel 68.05 clamps (Design 3) and 850mm long temporary rail joint fishplate, when opening the line at speeds between 50mph and 80 mph.


Edition : E1
File Size : 1 file , 650 KB
Number of Pages : 18
Published : 06/01/2006

History


Related products

NR X81110 ISSUE 2
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Auto Lower Circuits Barrier Control Circuits (1)
5.70 €
NR NR/CIV/SD/2516 ISSUE B
Published Date: 09/02/2017
Modular Overbridge Design: Reinforced Earth Abutment and Cill Details
5.70 €
NR RT/ETE/5/4/1
Published Date: 03/17/1998
Negative Bonding Connections to Aluminium Busbar
5.70 €
NR NR/L3/OCS/044/FS-20C ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Commercial Filming/Breaking News and Promotions - Commercial Filming Considerations for Local Instruction Risk Assessment
5.70 €

Best-Selling Products

CEI 0-1;AB
Published Date: 06/01/2023
Adozione di nuove norme come base per la certificazione dei prodotti nei paesi membri del CENELEC
CEI 0-10;AB
Published Date: 03/01/2023
Guida alla manutenzione degli impianti elettrici
CEI 0-10
Published Date: 02/01/2002
Guida alla manutenzione degli impianti elettrici
40.50 €
CEI 0-10
Published Date: 02/01/2002
Guida alla manutenzione degli impianti elettrici
40.50 €
CEI 0-11;AB
Published Date: 06/01/2022
Guida alla gestione in qualità delle misure per la verifica degli impianti elettrici ai fini della sicurezza
CEI 0-11
Published Date: 09/01/2002
Guida alla gestione in qualità delle misure per la verifica degli impianti elettrici ai fini della sicurezza
28.20 €