NR RT/CE/P/003 ISSUE 2 PDF

NR RT/CE/P/003 ISSUE 2 PDF

Name:
NR RT/CE/P/003 ISSUE 2 PDF

Published Date:
10/01/1997

Status:
[ Inactive ]

Description:

TECHNICAL APPROVAL-PROCEDURES FOR CIVIL ENGINEERING SCHEMES (aka NR/SP/CIV/003)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

These procedures apply to:-

• the civil engineering and building structural content of all Schemes (except as given below) proposed to be implemented by or on behalf of Railtrack;

• proposals for temporary works associated with such Schemes.

These procedures do not apply to:-

• normal day-to-day maintenance work and like-for-like repairs (including repairs in similar or modern equivalent materials);

• normal permanent way renewals provided no significant realignment is involved;

• feasibility studies and other preliminary designs;

• mechanical, electrical, signalling, control and telecommunications services, installations or equipment;

• non-structural aspects of buildings (e.g. architectural fixtures and finishes);

• work carried out under emergency conditions (except to such extent as is reasonably practicable in the particular circumstances);

• assessments of existing structures;

• works carried out by or on behalf of organisations other than Railtrack provided that such works are not to be owned by Railtrack.

They do not cover the processes for obtaining any necessary approvals from bodies outside Railtrack (e.g. planning authorities, HMRI).

Except for the design and checking of design of temporary or staging works, they do not cover the construction (execution/implementation) of Schemes, commissioning or handover.

PURPOSE

To define procedures for the approval of the:-

• sponsor's remit (or brief),

• principles of design (Approval in Principle), and

• detailed design and checking of design

for proposed changes to Railtrack's civil engineering infrastructure and building structures.


Edition : 2
File Size : 1 file , 240 KB
Number of Pages : 27
Published : 10/01/1997

History


Related products

NR X82190 ISSUE 1
Published Date: 06/07/2003
MCB-CCTV Typical Circuits CCTV Receiver Cubicle Mechanical Details
$5.7
NR R25111 ISSUE 1
Published Date: 09/11/1997
Route Relay Interlocking, Typical Circuits Points Power Points: Control & detection (Clamplock Type) where Motor Cut off Timer is situated at the Interlocking: Through Circuits: Via Repeater Location
$5.7
NR SMF/SG/0200 ISSUE 1
Published Date: 06/01/2007
Standard Maintenance Form - AWS Site Disconnection Notice
$5.7
NR NR/L3/MTC/RCS0216/TK64 ISSUE 4
Published Date: 09/04/2021
Risk Control Manual: Oxygen Fuel Gas Cutting and Heating
$5.7

Best-Selling Products

ASIS ORM.1-2017
Published Date: 06/19/2017
Security and Resilience in Organizations and their Supply Chains - Requirements with Guidance
$57.9