NR RT/CE/P/020 ISSUE 1 PDF

NR RT/CE/P/020 ISSUE 1 PDF

Name:
NR RT/CE/P/020 ISSUE 1 PDF

Published Date:
08/01/1995

Status:
[ Withdrawn ]

Description:

Use of the Model Works Agreements for the Construction of New Bridges by or for Outside Parties

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

These procedures apply to the use of the model works agreements for new underbridges for, or new overbridges by, outside parties (Railtrack Line Codes of Practice RT/CE/C/018 and RT/CE/C/019).

PURPOSE

To ensure that Works Agreements produced to cover the construction of new bridges by, or for, outside parties are produced in a consistent manner and that they:

a) follow a standard format

b) contain all necessary requirements

c) can be produced without undue time and effort

d) can be readily accepted by the outside party

e) safeguard Railtrack's technical requirements and standards


Edition : 1
File Size : 1 file , 130 KB
Number of Pages : 9
Published : 08/01/1995

History


Related products

NR NR/PRC/MPI/PP09 ISSUE 1
Published Date: 10/20/2006
Manage Change
$18.6
NR BRS-SM 3278 ISSUE A
Published Date: 12/02/2013
IBCL Operated Point Layout with Tubular Stretcher Bars - NR56 FVS switches - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7
NR NR/CIV/SD/1030 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Wide Floor >30-55 Degrees Skew - Sheet 3 of 4
$5.7
NR NR/L3/MTC/RCS0216/MAT02 ISSUE 2
Published Date: 06/05/2021
Risk Control Manual: Switch and Crossing Panel Vehicles (SCPV)
$5.7

Best-Selling Products

Process Plant Commissioning : A User Guide
Published Date: 01/01/1990
$25.146